Information
-
Audit Title
-
Contractor / Phase
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Working at Heights
-
1.1. Fall risks of 2m or more? (including voids, pits, and trenches)
-
1.2. Proper working platform
-
1.3 Proper access to working area?
-
1.4 Proper fall protection system provide?
-
1.5 PPE provided to workers i.e safety harness
-
1.6 Lifeline provided?
-
1.7 Any Permit To Work issued?
-
1.8 Any training/briefing/awareness conducted?
2. Plant and Equipment
-
2.1. Unsafe or damaged plant/equipment? (including missing or damaged guards)
-
2.2. Incorrect plant /equipment for job? (e.g. grinding discs for cutting)
-
2.3. Certificate of Fitness .i.e PMA/PMT
-
2.4. Operator competency
-
2.5. Lack of training in safe operation, clean-up and maintenance?
-
2.6. Lack of inspection?
3. Scaffolds
-
3.1. Unlicensed persons erecting scaffold above 4m?
-
3.2. Unsafe or incomplete scaffold?
-
3.3. Lack of inspection protocol for scaffold?
-
3.4. Incompatible scaffold components? Unlabelled or untagged scaffolds being used.
-
3.5 Proper design for scaffold?
4. Lifting Equipment
-
4.1. Unsafe or damaged plant?
-
4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?
-
4.3. Lack of maintenance, testing and inspection?
-
4.4. Lack of SWL information displayed?
-
4.5. Lack of daily inspection protocol?
-
4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?
-
4.7. Valid PMA
-
4.8. Unlicensed operators?
5. Ladders / Staircase
-
5.1. Unsafe or damaged ladders / staircase?
-
5.2. Unsafe positioning of ladders / staircase?
-
5.3. Ladder / staircase not properly secured?
-
5.4. Ladder unsuitable for job? (e.g. metal ladder used for electrical work)
6. Emergency Response
-
6.1. Lack of, or no emergency plans at site? including ERT Org Chart, Emergency contact number
-
6.2. Emergency procedures / assembly area not displayed at site?
-
6.3. Lack of training and rehearsal of emergency plans?
-
6.4. Lack of, or inadequate first aid kits & fire fighting equipment for site?
-
6.5. Trained First Aiders for all shifts?
7. Traffic Management
-
7.1. Lack of, or inadequate, Traffic Management Plan (TMP) in place?
-
7.2. Lack of training in TMP for all persons on site? <br>(contractors and visitors)
-
7.3. Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)
8. Personal Protective Equipment (PPE)
-
8.1. Lack of system to issue, inspect, replace and monitor PPE?
-
8.2. Lack of training in safe use, clean-up and inspection of PPE?
-
8.3. Safety Shoe
-
8.4. Safety Helmet
-
8.5. Safety Harness
-
8.6. Other PPE
9. Work Environment
-
9.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)
-
9.2. Insufficient lighting?
-
9.3. Inadequate housekeeping?
10. Electrical Hazards
-
10.1. Unsafe electrical DB? (damaged, out of test date or untested)
-
10.2. Wire lay on ground
-
10.6. Proper electrical connection
-
10.7. Electrical equipment near water?
-
10.8. Electrical equipment near flammables?
11. Environmental Hazards
11.1. Scheduled Waste Management
-
11.1.1. Notification of schedule waste generation to DOE
-
11.1.2. Proper storage area
-
11.1.3. Updated inventory list
-
11.1.4. Proper labelling & coding
-
11.1.5. Scheduled waste collector & facility provider are registered and approved by DOE
-
11.1.6. Disposal of scheduled waste as per requirement (more than 180 days/morethan 20 tonne from the date of generation.
-
11.1.7. Consignment notes availability
11.2. Solid Waste Management
-
11.2.1. Domestic waste is properly managed at site
-
11.2.2. Construction waste is properly managed at site
-
11.2.3. Designated area for solid waste collection
-
11.2.4. Approved solid waste contractor by local authorities
11.3. Spillage Control
-
11.3.1. Concrete mixer
-
11.3.2. Bar bending machine
-
11.3.3. Generator sets
-
11.3.4. Maintenance of vehicles/machineries
-
11.4.4. Chemical spillage
11.5. Erosion & Sediment Control
-
11.5.1. Silt trap/retention pond/sediment basin are properly managed at site.
-
11.5.2. Drainage system is properly managed
11.6. Sewerage & Sullage Control
-
11.6.1. Sewerage is properly managed at site
-
11.6.2. Sullage is properly managed at site
11.7. Environmental Mitigation Measure
-
11.7.1. Wash through
-
11.7.2. Road/access maintenance
12. Administrative Procedures
-
12.1. Availability of Safety, Health & Environment Policy
-
12.2. Policy being displayed?
-
12.3. Policy being communicated?
-
12.4. Availability of Safety & Health Officer &/ Site Safety Supervisor
-
12.5. Lack of/or inadequate training, licenses, skills, experience?
-
12.6. HIRADC established as per current activity
-
12.7. Site registration with DOSH
-
12.8. All site personnel have a valid CIDB Green Card
-
12.9. Adequate of ESH signages displayed at site
Corrective Action Request (CAR)
-
Any CAR to be issued?
-
Tap to enter information
Other Comments
-
Other Comments
Sign Off
-
On site representative
-
SDP ESH Representative