Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Policy
-
1. Policy being displayed
-
2. Policy being communicated
2. Scheduled Waste Management
-
1. Notification of Scheduled Waste generation to DOE
-
2. Proper storage area
-
3. Updated inventory list
-
4. Proper labelling & coding
-
5. Scheduled Waste collector & facility provider are registered and approved by DOE
-
6. Disposal of Schedule Waste as per requirement (Not more than 180 days / not more than 20 tonne from the date generation)
-
7. Consignment notes availability
3. Solid Waste Management
-
1. Domestic Waste is managed properly at site
-
2. Construction Waste is managed properly at site
-
3. Domestic Waste is managed properly at Kongsi
-
4. Designated area for Solid Waste
-
5. Approved Solid Waste collector by Local Authorities
-
6. No traced of open burning
4. Spillage Control
-
1. Sufficient containment bund is provided for concrete mixer, bar bending machine & generator set
-
2. Maintenance of Vehicles/Machinery
-
3. Chemical Spillage
5. Erosion & Sediment Control
-
1. Silt Trap/Retention Pond/Sediment Basin located at the lowest point
-
2. ESCP constructed as per approved & endorsed drawings
-
3. Silt trap is properly maintain
-
4. Geotextile used for gabions and silt traps in good condition
-
5. Perimeter drain constructed along Project boundary
-
6. Slopes are properly protected (i.e compacted, turfed, plastic sheet)
-
7. Earth stockpiled protected by plastic sheet
-
8. Silt fence properly installed and maintained
-
9. Wash through facilities provided at exit point and effectively functioned
-
10. Water browser deployed
-
11. Drainage system cleared of sedimentation
-
12. Sewage and sullage discharge not channel to silt trap
-
13. Proper installation and maintenance of check dams
-
14. Access road is properly maintained
6. Sewerage and Sullage Control
-
1. Sewerage is managed properly at site
-
2. Sullage is manage properly at site
-
3. Sewerage is managed properly at kongsi
-
4. Sullage is managed properly at kongsi
7. Environmental Mitigation Measure
-
1. Wash through
-
2. Road/access maintenance
8. Personal Protective Equipment
-
1. Safety Boots
-
2. Safety Helmet
-
3. Safety Harness
-
4. Hand protection
-
5. Other PPE (face shield, hearing protection, dust mask, safety vest)
9. Scaffolding
-
1. Competent Erector and inspector
-
2. Tagging System
-
3. Inspection Checklist
-
4. Endorsed design
-
5. Scaffold erected as per endorsed drawing (platform, railing, cross brace, wall tie, access, base)
-
6. Condition of scaffold
10. Form Work/False Work
-
1. Calculation & design by PE
-
2. Inspection by competent person
11. Working at Height
-
1. Proper working platform
-
2. Proper access/staircase
-
3. Proper PPE (harness, safety Shoe, helmet)
-
4. Supervision
-
5. Permit to Work System
12. Hot Work
-
1. Permit To Work System
-
2. Fire Extinguisher Provided
13. Hard Barricade
-
1. Exposed edges, floor opening and lift core barricaded
-
2. Barricade or cover are firm
-
3. Staircase have railings
-
4. Warning sign
14. Excavation
-
1. Barricade around excavated area
-
2. Adequate protection electrical installation
-
3. Proper access and ingress
-
4. Warning sign
-
5. Permit to Work system
15. Electrical Safety
-
1. Warning sign
-
2. Proper electrical installation
-
3. Responsible person
-
4. Electrical wire not laid in ground
-
5. Portable tools inspected and certified safe
16. Certificate of Fitness
-
1. Air compressor
-
2. Crane
-
3. Competent Operator
-
4. Crane maintenance record
-
5. Passanger hoist
-
6. Passenger hoist maintenance record
-
7. Training records
-
8. Inspection record
17. Housekeeping
-
1. Work area
-
2. Canteen area
-
3. Kongsi Area
18. Emergency Preparedness & response
-
1. Available & displayed ERT Chart
-
2. Available & displayed Emergency Escape Route
-
3. Fire Fighting Equipment
-
4. First Aid Facilities
-
5. Assembly area
-
6. Emergency contact number displayed
-
7. Emergency and evacuation drill conducted
19. Confined Space
-
1. Warning sign
-
2. Permit to Work system
-
3. Competent Person
-
4. Supervision and Standby Person
20. General Requirement
-
1. Site registration with DOSH
-
2. Availability of qualified SHO/Safety Supervisor and designated Environmental Officer
-
3. CIDB Green Card availability
-
4. Adequate display of ESH signage's, notices, info i.e. Safety First, Safety reminder, Wearing of Suitable PPE, dangerous/harmful chemical and flammable material
-
5. Safe access & egress
-
6. Adequate lighting
-
7. Adequate toilet facility
-
8. Water ponding
-
9. Availability & displayed Safety Committee chart
-
10. Appointment letter & minute of meeting
21. SDP Requirement
-
1. Approved SHMP
-
2. Approved EMP
-
3. ESH Inspection Checklist
-
4. Water quality monitoring within stipulated limit (EIA Approval Condition)
-
5. Air quality monitoring within stipulated limit (EIA Approval Condition)
-
6. Noise monitoring within stipulated limit (EIA Approval Condition)
-
7. Written notice from Department Of Environment for installation of diesel Powered power Generator. (More than 110 KVA)
Other non compliance
-
Other non compliance issues
Corrective Action Request (CAR)
-
Deadline for submission of Corrective Action
Other Comments
-
Other comments
-
On site representative
-
Consultant/SDP Technical Supervisor
-
SDP ESH Representative
-