Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Policy
-
1. Policy being displayed
-
2. Policy being communicated
Scheduled Waste Management
-
1. Notification of Scheduled Waste generation to DOE
-
2. Proper storage area
-
3. Updated inventory list
-
4. Proper labelling & coding
-
5. Scheduled Waste collector & facility provider are registered and approved by DOE
-
6. Disposal of Schedule Waste as per requirement (Not more than 180 days / not more than 20 tonne from the date generation)
-
7. Consignment notes availibility
Solid Waste Management
-
1. Domestic Waste is managed properly at site
-
2. Construction Waste is managed properly at site
-
3. Domestic Waste is managed properly at Kongsi
-
4. Designated area for Solid Waste
-
5. Approved Solid Waste collector by Local Authorities
Spillage Control
-
1. Concrete mixer
-
2. Bar Bending Machine
-
3. Generator set
-
4. Maintenance of Vehicles/Machinery
-
5. Chemical Spillage
Erosion & Sediment Control
-
1. Silt Trap/Retention Pond/Sediment Basin are manage properly
-
2. Drainage is manage properly at site
-
3. Slope protection
Sewerage and Sullage Control
-
1. Sewerage is managed properly at site
-
2. Sullage is manage properly at site
-
3. Sewerage is managed properly at kongsi
-
4. Sullage is managed properly at kongsi
Environmental Mitigation Measure
-
1. Wash trough
-
2. Road/access maintenance
Personal Protective Equipment
-
1. Safety Boots
-
2. Safety Helmet
-
3. Safety Harness
Scaffolding
-
1. Competent Erector
-
2. Tagging System
-
3. Inspection Checklist
-
4. Approved design
Form Work/False Work
-
1. Calculation & design by PE
-
2. Inspection by competent person
Working at Height
-
1. Proper working platform
-
2. Proper access/staircase
-
3. Proper PPE (harness, safety Shoe, helmet)
-
4. Supervision
-
5. Permit to Work System
Exposed Floor Edges
-
1. Baricade or cover are provided
-
2. Barricade or cover are firm
Floor Opening
-
1. Barricade or cover provided
-
2. Barricade or cover are firm
-
3. Warning sign
Electrical Safety
-
1. Warning sign
-
2. Proper electrical installation
-
3. Responsible person
-
4. Electrical Wiring
Certificate of Fitness
-
1. Air compressor
-
2. Crane
-
3. Competent Operator
-
4. Servicing record
-
5. Passanger hoist
-
6. Servicing record
-
7. Portable Gondola Lift
-
8. Servicing record
Housekeeping
-
1. Work area
-
2. Canteen area
-
3. Kongsi Area
Emergency Preparedness & response
-
1. Available & displayed ERT Chart
-
2. Available & displayed Emergency Escape Route
-
3. Fire Fighting Equipment
-
4. First Aid Facilities
-
5. Assembly area
Confined Space
-
1. Warning sign
-
2. Permit to Work
-
3. Competent Person
-
4. Supervision and Standby Person
General Requirement
-
1. Site registration with DOSH
-
2. Availability of qualified SHO/Safety Supervisor and designated Environmental
-
3. CIDB Card availability
-
4. Adequate display of ESH signages i.e. Safety First, Safety reminder, Wearing of Suitable PPE, dangerous/harmful chemical and flammable material
-
5. Safe access & agress
-
6. Adequate lighting
-
7. Availability & displayed Safety Committee chart
-
8. Appointment letter & minute of meeting
SDP Requirement
-
1. Approved SHMP
-
2. Approved EMP
-
3. ESH Inspection Checklist
-
5. Water quality monitoring
-
6. Air quality monitoring
-
7. Noise monitoring
-
8. Written notice from Department Of Environment for istallation of diesel Powered power Generator. (More than 110 KVA)
Other non compliance
-
Other non compliance issues
Corrective Action Request (CAR)
-
Deadline for submission of Corrective Action
Other Comments
-
Other comments
-
On site representative
-
Consultant/SDP Technical Supervisor
-
SDP ESH Representative
-