Information
-
Document No.
-
Conducted on
-
Inspection Completed on:
-
Facility Name:
- West Memphis Pipe Plant
- Como Precast Plant
- Jackson Northside
- Jackson I55
- Hattiesburg Pressure Pipe
- Hattiesburg Precast/Bridge
- Mobile Pipe
- Dothan Sales Yard
- Gulfport Sales Yard
- Marianna Precast
- Gretna Pipe
- Panama City Precast
- Jacksonville Terminal
- Green Cove Springs
- Palatka Pressure Pipe
- Deland Precast
- Winter Haven Pipe
- Hanson Slag
- Cape Canaveral Terminal
- Cocoa Slag
- Port Everglades Terminal
- Tampa Terminal
- Deerfield Beach Roof Tile
- Fort Myers Roof Tlie
- Hobe Sound Roof Tile
- Sanderson Roof Tile
- Ocala Roof Tile
-
Areas covered by inspection:
- RCP Plant
- Dry Cast Plant
- Wet Cast Plant
- Pressure Pipe
- Steel Pipe
- Fabrication Shop
- Fitting Shop
- Maintenance Shop
- Vehicle Maintenance Shop
- Fuel Tank(s)
- Oil/Lube Tank(s)
- Product Storage Yard
- Painting and Coating
- Sand Blasting
- Wet Sawing
- Core Drilling
- Washout Pits
- Oil/Water Seperator
- Concrete Batch Plant
-
ESH Team member(s) completing inspection:
-
Facility Personnel accompanying ESH Team:
-
Do any open items remain from the previous inspection?
-
Open Item Document Number:
-
Was the inspection Report reviewed with the Plant Manager (or designee) prior to leaving the Facility?
-
Please sign as receipt of the attached inspection.
-
Cut and Paste E-mail return receipt if forwarded after leaving the facility.
-
Is there an item of concern?
Inspection Item
-
Is this a repeat item of concern?
-
Location of Concern?
- RCP Plant
- Dry Cast Plant
- Wet Cast Plant
- Pressure Pipe
- Steel Pipe
- Fabrication Shop
- Fitting Shop
- Maintenance Shop
- Vehicle Maintenance Shop
- Fuel Tank(s)
- Oil/Lube Tank(s)
- Product Storage Yard
- Painting and Coating
- Sand Blasting
- Wet Sawing
- Core Drilling
- Washout Pits
- Oil/Water Seperator
- Concrete Batch Plant
-
Category?
- Air
- Water
- Waste
- SWPPP
- SPCC
- Housekeeping
-
Describe the concern:
-
Add a photograph if needed.
-
Is this an Action Item?
-
Corrective Action:
-
Date Corrective Action is to be completed?