Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Post Audit

  • Adequate customer communication & customer service prior to, during & after work.

  • Customer notified on completion of work verbally or on an EE calling card

  • Switchboard effectively cleaned, free of debris, tidy, Asbestos waste & general waste removed

  • Asbestos sticker applied to switchboard panel

  • All Essential Energy equipment sealed

  • Phase sequencing marked on panel

  • Phase sequence recorded

  • Main Switches, circuit breakers & fuse isolated

  • What Main Switches, circuit breakers & fuses are Isolated

  • Service fuses removed that contain ACM

  • Correct termination clamps used at all points

  • All shear off connections are sheared off

  • Point of Supply/ connection point Neutral bond connected

  • Sufficient drip loops at connection points

  • Connections & conductors installed, connected & secured as per EE construction standards

  • New Service Conductor has correct clearances, tension, height, complies with Service Installation rules of NSW

  • New Mains Box installed

  • Was a new Mains Box required

  • Was a new Mains Box required

  • New isolation device installed

  • Was a new isolation device required

  • Was a new isolation device required

  • Two piercing connections used on insulated distribution mains & bonding tails

  • Redundant hardware has been removed

  • Vegetation clearing has been completed

  • Premise has been left safe, free of rubbish, no property damage & remedial works are not required

  • Destructive connection testing has been conducted

  • A phase - E volts (No Load)

  • B phase - E volts (No Load)

  • C phase - E volts (No Load)

  • A phase - N volts (No Load)

  • B phase - N volts (No Load)

  • C phase - N volts (No Load)

  • Neutral - Independent Earth volts (No Load)

  • A phase - Amps (No Load)

  • B phase - Amps (No Load)

  • C phase - Amps (No Load)

  • Neutral - Amps (No Load)

  • Main Earth/Earth Stake Amps (No Load)

  • A phase - E volts (With Load)

  • B phase - E volts (With Load)

  • C phase - E volts (With Load)

  • A phase - N volts (With Load)

  • B phase - N volts (With Load)

  • C phase - N volts (With Load)

  • Neutral - Independent Earth volts (With Load)

  • A phase - Amps (With Load)

  • B phase - Amps (With Load)

  • C phase - Amps (With Load)

  • Neutral - Amps (With Load)

  • Main Earth/Earth Stake Amps (With Load)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.