Title Page
-
Client
-
Site
-
Location
-
Conducted on
-
Prepared by
-
Foreman
-
Contract Manager
Previous Report - Actions/Recommendations - Status of addressing or closing out
-
Date carried out, by whom & details
General
-
*Is Eurogold Quality ‘Think Safety - Don’t Walk By’ & site information board available and legible?
-
Is it clear where personnel & visitors are to report in site; is the register of site attendance being completed (Eurogold personnel and visitors)
-
Have all personnel been inducted and a register kept? (Eurogold personnel, visitors and any contractors)
-
Are the CDM site files available on site? (Construction Phase Plan inc PCI reference docs)
-
Is the Site Specific Health & Safety File available? *Eurogold Red File*
-
Is the CDM Board displayed? <br>F10: HSE Law poster: Hospital Route: Contacts: First Aid
-
Is there a copy of Employers and Public Liability Insurance available and in date?
-
Are Method Statements and Risk Assessments available for works being undertaken (including other Contractors) and is there evidence of such being communicated to the workforce with signatures obtained?
-
Are CoSHH Assessments for Materials/Substances available on site?
-
Are copies of training records/ certificates available on site? (CSCS/ CPCS/ NPORS/ First Aid/ SSSTS/ SMSTS/ NRASWA/ Confined Space etc)
-
Are copies of face fit testing certificates available on site? (in date - within 2 years)
-
Are copies of Inspection & Maintenance Records for Plant/ Equipment available on site and in date?
-
Are copies of LOLER Inspection Records available and in date?
-
Where required, are Permits to Work raised and completed correctly?
-
What is the subject for this months Tool Box Talk and when was it delivered (are they being done every month?
-
Are Daily Activity Briefings *DABs being documented reflecting the days tasks/controls etc and have personnel signed to confirm attendance?
-
Have Weekly Site Inspections been carried out?
-
Are there Company Policies available on site and are they signed/in date?
-
UU Part 2 Connection (R&S off site connection) if works are being undertaken during the inspection, has the team logged on/off? If yes, what time and who with?
Site Set Up/Management
-
Is the site enclosed/perimeter secured to try to prevent trespassers/unauthorised persons gaining access to site?
-
Is there adequate signage for the Public? (Warning, danger, keep out, emergency numbers)
-
Is there a secure area for storage of plant/ materials/ substances during times when site is closed?
-
Is the Eurogold storage compound (including containers) well established and organised?
-
Is there a First Aider on Site? (Who/Name)
-
Are there adequate First Aid supplies available & where are they located?
-
Are fire fighting provisions available?
-
Is a fire muster point established on site? If so, where?
-
Is Welfare catered for? (Toilet/ Washing/ Canteen) and are they clean/tidy?
-
Is there a Site Traffic Management Plan in place, regularly updated and is it being managed/observed?
-
Are segregated pedestrian routes established to points of work
-
Are traffic routes free of excessive slurry & S/T/F hazards?
-
Are obstacles/hazards clearly marked or protected (eg mushrooms on pins / cones on temporary trip hazards?)
-
Are there Bucket Storage areas established (fencing/barriers with signage affixed)
-
Are cutting activities (block, paving etc) being undertaken safely I.e. use of suppression, PPE/RPE & not presenting risk to others in vicinity?
-
Is there a site level team effort in managing the site setup or are there other influences, eg management / client?
Plant & Equipment
-
Have Daily Inspections of Plant/ Equipment been carried out and findings recorded in the Pre-Start Inspection Book? <br>
-
Should any defects or issued be recorded, can the Foreman confirm this has been logged on CoffeeFuelled - what date.
-
Have Tool Inspection and referenced HAVS registers been completed?
-
*Is electrical equipment PAT tested & certificate/register available?
-
Are cables in good visual condition (office/canteen)?
-
Are chains/shackles stored correctly (hanging), displaying the current ‘tab’ - proof of ‘examination’ & clean?
-
Are ‘WHIP’ devices in place on air compressed devices/hoses?
-
Are beacons in good working order (green beacons also to be in good working order to indicate operators are wearing their seatbelt)
-
Have excavators, dumpers and rollers been ‘greased’ in the last 5 days
-
Can machine drivers confirm safe working condition of forks and buckets (safety pins/ alignment of forks/ tooth condition etc) - are discussed points documented in Plant / Fork Inspection Book?
-
Are Mirrors clean and free from damage
-
Are lights in working order/free from damage?
-
Are audible alarms working (where installed)?
-
Are guards suitable, sufficient & correctly affixed? (eg stihl saws, edge protection)
-
Are handrails suitable & sufficient (embarking/disembarking from plant including 'boxing rings')?
-
Are seatbelts in good working order (no fraying/ locked off)
-
Are seatbelts being worn by Plant Operators? (Dumper, Roller etc)
-
Are warning signs affixed and legible? (Noise/ PPE/ SWL/ Quick Hitch/PPE/RPE/Thumbs Up.. etc)
-
Are ancillary safety controls being used? (e.g. cutting station incl. water suppression for cut-off saw)
-
Is there intrinsically safe equipment available/ being used where required (graft, shovel, pick) when working near services - HSG 47
-
Is there a CAT & genny available on site? (detail make) If yes, is it within calibration date?
Workplace
-
Where required, are Banksmen assisting plant/ vehicles?
-
Is good housekeeping being practised?
-
Are tools & equipment stored in close/safe proximity to working area?
-
Is ‘interface’ with other trades being suitably controlled?
-
When working near ‘services’ has HSG47 been followed? (CAT scan, Stat Dwg, Marked)
-
Excavations - hand digging only permitted within 500mm of services, is this being observed?
-
Where excavation is observed, is the HSG47 Compliance Board completed and visible in the location with a copy of Permit to Dig available
-
Where required is the shoring system suitable for protection of the workers i.e. trench box, sheet piles.
-
Where sheet piles are being utilised - is a Temporary Work design in place and available on site?
-
Are there any confined space works?
-
Is confined space equipment available for use i.e. gas detector, tripod, harness etc?
-
Stored material - safe distance from edges of excavations? Angle of repose?
-
Is Traffic Management (Chapter 8) being operated?
-
Chapter 8 - who is responsible for management? Do they hold NRASWA Qualification?
-
Are barriers/demarcation sited around bitumen burner?
-
Are all open edges/ holes appropriately protected to guard against falls of people and materials?
-
Is there a site level team effort in managing the workplace or are there other influences, eg management / client?
Environmental Considerations
-
Are there Spill Kits / Spill Pads available - where are they located
-
Are Spill Kits / Spill Pads suitable and sufficient/good condition
-
Are there drip trays available - where are they located
-
Are there enough drip trays and are they in sufficient/good condition
-
Are controls in place for potential silt / run off management
Personal Protective Equipment
-
Is PPE clean? (High-vis, visible, ear protection, dust mask clean?)
-
All personnel wearing hard hat?
-
All personnel wearing hi-visibility vest/ jacket/ coat (and trousers where working on road?)
-
All personnel wearing suitably protective boots/ wellingtons?
-
Additional PPE requirements as identified in task Risk/ COSHH Assessments & site rules?<br>Gloves <br>Eye Protection <br>Respiratory Protection
-
Are all personnel wearing PPE correctly? (Non conforming wooly hat/ hood under hard hat)
-
Have all Eurogold representatives been issued with and wearing Eurogold PPE?
Other
-
Are there any actions for commendation?
Sign Off
-
Findings have been discussed with Foreman (and Contract Manager if present)
-
Carried out by: