Title Page
-
WO
-
Who carried out this installation:
-
Conducted on
-
Prepared by
Cabling and containment
-
Are cables and/or containment correctly supported?
-
Is containment installed to a satisfactory standard?
-
Have cable holes been seal to maintain fire safety of the building?
Distribution board
-
Was new DB EV installed?
-
DB EV supplied from:
-
Circuit protective device (type and rating)
-
Picture of circuit protective device's connections (existing DB)
-
Picture of Henley blocks's connections
-
Cable used to supply DB EV:
-
Please specify cable used:
-
Live conductor size (mm²)
-
CPC size (mm²)
-
Is circuit protective device suitable for cable used?
-
Is IP rating of DB EV correct? (Cable entries, metal blanks present)
-
Is mechanical protection for cable entries present?
-
Are all labels and warning notices present?
-
Circus protective device supplying EV charger (type and rating)
-
Picture of DNO/henley blocks/ CT clamp/seals
-
Were seals installed to DNO fuse and meter?
-
Was a CT clamp installed on the correct tail, correct polarity and secured?
-
Is circuit protective device correct for the cable used?
- Yes
- No
-
Observations
EV charger
-
Picture of internal connections
Testing
-
Zs (Ohms)
-
RCD disconnection time (ms)
-
Are test results compliant?
Summary
-
Is cabling compliant to BS7671?
- Yes
- No
-
Was the engineer using the correct PPE (including for the temporary removal of DNO fuse, etc)?
-
Did the engineer follow correct procedures (safe isolation, temporary removal of DNO fuse, etc.)?
-
Was the engineer wearing arc resistant uniform?
-
Was the engineer using a torque screwdriver?
-
Were all connections tightened to the correct torque?
-
Any remedial action needed?
-
Comments on the installation
-
Score
-
Signature