Inspection Information
-
Project Name:
-
Project Location:
-
Permit #:
-
Date of Inspection:
Visual Inspection
Appliances
-
Appliances located within the perimeter of the hood, minimum of 6 inches:
-
Appliances on casters:
-
Caster channels installed or an alternative means to ensure appliances are returned to design position:
-
Chain / cable that is shorter than the gas lines secured to the wall and to the appliances:
-
Quick connect fittings are correctly installed with the flow of gas (check arrows):
-
Deep fat fryers are a minimum of 16 inches away from an open flame -or- an 8 inch steel or tempered glass baffle is installed:
-
Appliances are of the same size and type as shown on approved plans:
-
Hood and exhaust ducts are the same size as shown on approved plans:
Nozzles
-
Nozzle type is the same as shown in approved plans:
-
Nozzles are the correct distance above the cooking surface (see drawings / spec sheets):
-
Nozzles are correctly aimed using the laser (see spec sheets for proper aiming point):
Fusible Links
-
Fusible links positioned as shown on approved plans:
-
Fusible links proper temperature as indicated on approved plans:
Manual Pull Station
-
Pull station located 10 - 20 feet from the protected hood and in the path of egress:
Type K Fire Extinguisher
-
Type K fire extinguisher located 10 - 30 feet from the protected hood:
-
Sign posted over extinguisher stating to use hood system before extinguisher:
Visual Inspection Status
-
Visual Inspection Status:
-
Date of Completion:
Operational Test
Manual Activation (Pull Station)
-
System tripped:
-
Make-up air shut off:
-
Exhaust fan stayed on:
-
Gas feed shut off and had to be manually reset:
-
Electrical tripped to all appliances under hood:
-
Alarm activated / monitoring if applicable:
Automatic Activation (Fusible Link)
-
System tripped:
-
Make-up air shut off:
-
Exhaust fan stayed on:
-
Gas feed shut off and had to be manually reset:
-
Electrical tripped to all appliances under hood:
-
Alarm activated / monitoring if applicable:
Operational Test Status
-
Operational Test Status:
-
Date of Completion:
Inspection Status
Additional Comments
-
Comments:
Inspection Summary
-
Visual Inspection:
-
Operational Test:
Inspection Status
-
On-site Inspector:
- A. Hargrove - 840
- B. Patrick - 841
- P. Ayres - 842
- K. Clark - 843
-
Inspection Status:
-
Next Inspection:
-
Date Completed: