Title Page

  • Audit Title

Section 1

  • Note: This checklist should only be filled out if you are already in the possession of:
    1. The Building Survey for the property in question
    2. The EEM Design for the property in question
    This checklist is used to confirm the completeness/adequacy of the building survey and the EEM Design prior to the EEM installation.
    All items resulting in a negative"NO" or unknown answer shall be referred back to either the original Building survey surveyor or the EEM provider to obtain further information or confirmation as appropriate. If a negative answer is addressed positively elsewhere in the check sheet, further reference to the Building Survey Surveyor or EEM Designer is not required.

  • Survey Completed by

  • Client

  • Property Address
  • Date of Survey

Details/Condition of the property

  • Property Type:

  • Number of elevations to be treated

  • Agrees with the Building Survey

  • Property Construction:

  • Other Please State

  • No of Storeys of building

  • No of Storeys in individual unit

  • No of Storeys agrees with Building survey

  • Number of Bedrooms:

  • Agrees with Building Survey:

  • Approximate Year of Construction:

  • Conservation area status Established:

  • Planning permission status Established:

  • Building control status Established:

  • Does the wall have cavity insulation?

  • If no, has the cavity been sealed at the perimeter?

  • Need for fire separation of the compartments/Boundaries defined:

  • EEM Design: Accounts for the Building Regulation requirements for fire:

  • Building exposure assessed by the Building survey:

EEM DESIGN:

  • design accounts for building exposure:

  • Design accounts for loading in service e.g Impact:

  • Comments

  • Design eliminates cold bridging:

  • Design minimises cold bridging

  • Interface design details(weather seals etc.) comply with requirements of PAS 2030 2017:

Section 2

Existing Finishes: External/Internal

  • Agrees with Building survey?

  • External Finishes

  • Please state other type of finish.

  • Internal: Colours & Textures

  • Thickness of Insulated plaster board.

  • Other internal finishes please specify:

  • Comments:

Through Wall Construction

  • Internal to external surface layers

  • Layer 1

  • Layer 2

  • Layer 3

  • Layer 4

  • Layer 5

  • Layer 6

  • Layer 7

  • Overall Wall Thickness

  • Photo of wall thickness

  • Existing U-value: .............W/m2K (taken from EEM design)

  • Has a second through wall construction been identified ?

  • Layer 1

  • Layer 2

  • Layer 3

  • Layer 4

  • Layer 5

  • Layer 6

  • Layer 7

  • Overall Wall Thickness

  • Photo of wall thickness

  • Existing U-value: .............W/m2K (taken from EEM design)

  • Has a third through wall construction been identified ?

  • Layer 1

  • Layer 2

  • Layer 3

  • Layer 4

  • Layer 5

  • Layer 6

  • Layer 7

  • Overall Wall Thickness

  • Photo of wall thickness

  • Existing U-value: .............W/m2K (taken from EEM design)

Property Elevation Photos

  • Which Elevations exist on this property

  • Front Elevation Photos

  • Rear Elevation Photos

  • Left Hand Side (from the front) Elevation Photos

  • Right Hand Side (from the front) Elevation Photos

  • Garage and/or Out Buildings Photos

Property Measurements:

  • Property Sketch Photos

  • Front

  • Rear

  • Gable L

  • Gable R

  • Other

  • Agrees with Building Survey

Section 3

STRUCTURAL DEFECTS (E.g. Cracking, subsidence,weak or cored components):

  • Requires Competent Person e.g. Structural Engineer

  • Agrees with Building Survey

  • Photos of Structural Defects

  • EEM Design:

  • Remediation included in the design

  • Remediation measure included elsewhere

  • Site pull-out tests undertaken for mechanical fixings

  • System fixing design calculated for all loading conditions ( wind,system weight etc.)

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details( weather seals etc.) comply with requirements of PAS 2030 2017

  • Is there any evidence of structural defects ?

  • Details

  • Comments:

EXISTING RENDER:

  • Agrees with Building Survey

  • Photo(s)

  • EEM Design:

  • Requires removal, partial removal, repair

  • Remediation included in the design

  • Remediation measure included elsewhere

  • Comments:

PRESENCE OF DAMP (RISING, PENETRATING OR CONDENSATION):

  • Agrees with Building Survey

  • Photo(s)

  • EEM Design:

  • Remediation included in the design

  • Remediation measure included elsewhere

  • Comments

FROST DAMAGE:

  • Agrees with Building Survey

  • Photo(s)

  • EEM Design:

  • Remediation included in the design

  • Remediation measure included elsewhere

  • Comments

DETAIL/LOCATION OF MOVEMENT JOINTS:

  • Agrees with Building Survey

  • Photo(s)

  • EEM Design:

  • Included in the design

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals etc.) comply with the requirements of PAS 2030 2017

  • Comments:

MOSS/LICHEN/MOULD/IVY or EFFLORESCENCE

  • Agrees with Building Survey

  • Photo(s)

  • EEM Design:

  • Remediation included in the design

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals etc.) comply with requirements of PAS 2030 2017

  • Comments:

Section 4

HEATING SYSTEM - EXTERNAL PIPEWORK/FLUES/METER BOXES etc:

  • Detail type(s) and location(s) of the heating system(s) in the comments below

  • Agrees with Building Survey

  • Photo(s)

  • EEM Design:

  • Included in the design

  • Safety of the design (compliance with "Specification for the installation of external wall insulation ensuring the safety and operation of the fuel burning appliances ")

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals etc,) comply with the requirements of PAS 2030 2017

  • Comments:

EXISTING VENTILATION:

  • Agrees with Building Survey

  • Photo(s)

  • Will current roof vents be adequate after EWI has been installed?

  • Is there adequate ventilation in the subfloor?

  • Are there room ventilators / extractors where necessary? (E.G Bathroom/kitchen/utility)

  • Are the combustion ventilators adequate for the heating system(s)?

  • If any of the above are no are there provisions to be put in place for new ventilation?

  • If yes please give details

  • EEM Design:

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals etc.) comply with requirements of PAS 2030 2017

  • Comments

WINDOWS/DOOR MATERIAL:(Timber/PVC/Other):

  • Agrees with Building Survey

  • Photo(s):

  • Window material type

  • Window Renewal

  • Door material type

  • External Door Renewal

  • EEM Design:

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals around cill, window frame etc.) comply with requirements of PAS 2030/2017

  • Comments:

EXTERNAL SERVICES/ATTACHMENTS TO THE WALLS e.g (Satellite dish, lights):

  • Agrees with Building Survey:

  • Photo(s)

  • EEM Design:

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals around cill, window frame etc) comply with requirements of PAS 2030/2017

  • Comments:

EXTERNAL ELECTRICAL CABLES/EQUIPMENT:

  • Agrees with Building Survey:

  • Photo(s)

  • EEM Design:

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Design details (Penetration,fixings, weather seals etc.) comply with requirements of PAS 2030 2017

  • Comments:

Section 5

EWI ABUTMENT TO EAVES & ROOFS:

  • Agrees with Building Survey:

  • Photo(s)

  • EEM Design:

  • Design eliminates cold bridging (full continuity between wall and the roof insulation)

  • Design minimises cold bridging (partial continuity between wall and roof insulation)

  • Interface design details (weather seals etc.) comply with the requirements of PAS 2030/2017

  • Comments:

EWI ABUTMENT TO OTHER STRUCTURES (Conservatories extensions, garden walls, gate posts etc):

  • Agrees with Building Survey:

  • Photo(s)

  • EEM Design:

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals etc.) comply with requirements of PAS 2030/2017

  • Comments:

RAIN WATER AND DRAINAGE PIPES:

  • Agrees with Building Survey:

  • Photo(s):

  • EEM Design:

  • Can existing Pipework be moved ?

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Design details (Penetrations, fixings, weather seals, mounting blocks etc.) comply with the requirements of PAS 2030/2017

  • Comments:

DAMP PROOF COURSE(DPC) PROVISION AND LOCATION:

  • Agrees with Building Survey:

  • Photo(s)

  • EEM Design:

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Design details (E.g Insulated plinth below DPC) complies with requirements of PAS 2030/2017

  • Comments:

ARCHITECTURAL FEATURES (e.g. protruding stone work, tile sills, soldier courses):

  • Agrees with Building Survey

  • Photo(s)

  • EEM Design:

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Design details (Penetrations, fixings, weather seals,etc.) comply with requirements of PAS 2030 2017

  • Comments:

Section 6

Additional information

  • Is a Gas meter present ?

  • Add media

  • Is an Electric meter present ?

  • Add media

Summary

  • Is the building suitable for EWI, adhering to guidelines as set out in the Building Regulations and requirements of PAS 2030/2017

  • Company

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.