  • Line

  • Material:

  • Product Size and SDR

  • Product Type

  • Colour:

  • Coil / Length Number Inspected:

  • Auditor:

  • Conducted on:

  • Shift:

  • Team Leader:

  • Operator:

Extruder Set-Up

Extruder Checks

  • Is the image on the scanner within the specified wall thickness tolerance?

Production Paperwork

  • Is a Production Program available and been signed off and dated by Planning and Quality / Technical?

  • Has the following production information been completed?

  • Line Board Information

  • Extrusion Conditions Sheet

  • Conditioned Length Information

  • Has production paperwork been completed correctly and to the correct frequency?

Coiler Set-up

  • If required, has the Coiler been set to the correct caterpillar squeeze, torque and ID settings?

  • If required, has the Coiler Set Up Sheet been completed?

  • If required, has the metre marker been set to 1.000 - 1.010m?

Dimensional Checks

Wall Thickness (mm):

  • Wall Thickness (Specification):

  • Wall Thickness (Measured):

  • Is the wall thickness in tolerance? <br>

Outside Diameter (mm):

  • Outside Diameter (Specification):

  • Outside Diameter (Measured):

  • Is the Outside Diameter in tolerance?

Ovality (mm):

  • Ovality (Specification):

  • Ovality (Measured):

  • Is the Ovality in tolerance? <br>

Flat Spot (mm): Diameters 180mm to 355mm inclusive

  • Flat Spot (Specification):

  • Flat Spot (Measured):

  • Is the Flat Spot in tolerance? <br>

Length (m):

  • Length (Specification):

  • Length (Measured):

  • Is the Length in tolerance? <br>

Inspection Frequency

  • Is the inspection frequency correct for all measured items (including flat spot measurements, coiled ovality and metre marking checks)?

Temperature at Saw (or Coiler):

  • Temperature (Specification):

  • Temperature (Measured):

  • Is the Pipe temperature within the specified limits? <br>

Appearance

Visual Inspection:

  • Check for the following:

  • Correct Operator Inspection frequency

  • Scratches / Gouges / Tool Marks

  • Contamination in Pipe bore

  • Pipe Colour

  • Foil Appearance

  • Core Pipe Appearance (Protectaline Only)

  • Surface Contamination

  • Splits / Pin Holes

  • Is the visual appearance of the pipe acceptable?

  • Does the pipe have the correct markings as per the program and are these clearly legible?

  • Is the correct colour hot foil (Medec) marking being used?

  • Does the pipe have the correct shift code?

  • Is the pipe correctly labelled with the length number using a permanent marker?

Packaging and Storage

Packaging

  • Have the pipe ends been sealed with end caps or bags (when applicable)?<br>

  • Has the correct packaging been used (e.g. woods, strapping and security banding)?

  • Are the bundles (or coils) identified with the correct labels and tape?

Storage

  • Has finished product been stored correctly (e.g. Coils on matting)?

QC Requirements

Pipe Samples

  • Have the correct number of Pipe samples been submitted to the QC Laboratory?

  • Are these samples correctly labelled and the dimensions within specification?

Calibration

  • Are Micrometers and Pi Tapes calibrated, with the owners name and coloured sticker clearly visible?

Reject Material

  • Is reject product clearly identified (with reject tape / Material ID tape) and cut back to the correct length?

Audit Review

Audit Non-Conformities Identified

    Non-Conformities Below
  • Description of Non-Conformity

  • Photograph of Non-conformity

  • Action Taken

  • Responsibility

  • Date Completed

Audit Review Signatures

Operator:

  • Signature:

  • Date:

Team Leader:

  • Signature:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.