Title Page
- Roof
-
Edge protection
-
Parapet walls and concreate plinths
-
Access ladders and platforms
-
Anchorage points
-
Waterproofing
-
Expansion joints penetrations
-
Drainage
-
Water pipes insulation
-
Ac pipes insulation
-
Power cables secured
Lighting protection
-
Conductor installation is properly earthed.
-
All connections secured at joints
-
Lighting arrester pole is secured at base
Earthing protection
-
Earth pit checked and maintained
-
Earth continuity
-
Voltage between Earth and Neutral is .3V
Exterior surfaces
-
Facade and frameworks
-
External cracks
-
Glazing and windows
-
Paint conditions
-
Shades/pergolas properly secured anchored, including foundations bolts exposed
-
Cladding secured and sealed
-
All floor levels maintained as per DUDC guidelines of 5mm
-
Ramp wheel chair access as per DUDC guidelines
Class rooms
-
All glass panels are visually protected and signage placed at low levels
-
All electrical outlets are PAT tested twice a year
-
Storage cabinets are secured properly onto the wall including shelves or any suspensions
-
Light conditions
-
False ceiling secured
-
Absence of moisture and ceiling mildew
-
AC supply and return grills cleaned
-
Check exhaust & fresh Air supply if available<br>
-
Proper circulation of AC <br>
-
Air temp and humidity levels<br>
Corridors
-
Zone control valves are well marked just below the false cieling
-
Entire area well lit and sensors on with emergency lights at regular intervals <br>
-
Floor coverings well in place all joints secured expansion joints caps secured on walls<br>
-
Wall coverings, ceiling tiles, Corridor painting/skirtings<br>
-
All grills and light fitting cleaned<br>
-
All wall hangings and decoration placed in a manner CCTV view is not blocked<br>
-
Floorings are slip resistance<br>
Stair cases
-
Step edges has antislips in grooves or antislip 3M tapes<br>
-
Stair case pressuring units functional (wherever provided)<br>
Public areas internal
-
Sufficient landing between the main entrance doors and steps <br>
-
Easy access ramp for wheel chair <br>
-
Sufficient clearance is maintained at main door from floor to avoid rubbing floor<br>
-
Signages are ear marked for offices, toilets and other areas<br>
-
Detectors functonal with pulse indications<br>
-
All control panels visible and functional at reception area ( fire alarm, gas panel)<br>
-
All possible places to install no hold door closers for glass doors<br>
Storage rooms
-
All items inventory lists are kept in storage rooms
-
All storage room has to be marked with yellow round stickers to ensure its always locked
-
Storage are well ventilated.
-
Non serviceable items not to be stored
-
Combustible items / Acid and corrosive items to be stored separately with proper ventilation and identification ( MSD to be displayed) esp pool chemicals<br>
Public area external
-
Check in at guard room sufficient place for visitors to sign in preferably shaded area<br>
-
Visitor entry register are in good condition not shatered and worn out<br>
-
Access from Car parks to school building surroundings are clear and clean<br>
-
Access motorised gates are well maintained regularly <br>
-
All gradients are within specifics of DUDC<br>
-
Landscping are well maintained looks lively and well nourished all dead leaves removed dates old leaves trimmed<br>
-
Way signs from car park to the required destinations are well displayed especilaly assembly points<br>
-
All hill curbs manholes painted and in clean conditions in level without any trip hazard<br>
-
All external lights including bollard lights cleaned and aligned. Night illuminations are in operational conditions.<br>
-
Entrance door push pull signs<br>
-
Sufficient clearance is maintained between door and handle to avoid finger strike<br>
-
Sufficient clearance is maintained between door and handle to avoid finger strike<br>
-
Aluminium door frames areas between moving and stationary are cleaned brushes in place air leaks sealed<br>
-
All exhaust and fresh air grills at basement carpark area well cleaned dusted & painted off from rust, any crack repairs leakges are attended periodically
-
All boundary lights are installed and working<br>
-
Pavement tiles are in level and proper separation from plot limits<br>
-
Privacy screen where ever required are in place<br>
-
Shades pergolas are in good conditions with all steel ropes in place and base plate secured<br>
-
Water coolers are covered and inside surroundings clean, installed for high grade filters<br>
-
All electricals cables/ CCCTV cables/AC pipes well concealed in GI trunking and not visible<br>
-
Tall trees well secured/ no trip hazards<br>
-
Car Parks and other areas well illuminated during nights <br>
-
Motion Sensors on and functional for basement parkings
Reception area
-
Furnitures well placed<br>
-
Rulers pictures well displayed within guidelines <br>
-
AC grills lights cleaned and working<br>
-
Indoor plants well nourished and trimmed<br>
-
All glass panels doors are cleaned and vision protected for all heights<br>
-
Entire area well lit<br>
-
Fire panel/Gas panel/emergency lights functional well visible and are clear off for easy access<br>
-
Panic alarm light and alarm functional and visible<br>
-
Visitors seating in good order, walls painted with students art work display<br>
-
Visitors toilets cleaned with proper cleaning check list schedules<br>
-
Reception area temp well maintained with contiunous air flow<br>
-
External door mat in place to prevent dust entering in <br>
Staff canteen/Pantry
-
Pantry is well cleaned with proper exhaust<br>
-
Flooring in good order<br>
-
Sink tops are clear of water moisture<br>
-
Splash guard around sink to avoid water seepage into the cabinet to avoid fungus or mold <br>
-
Electrical outlets not overloaded with adaptors<br>
-
Fly O killer in place and maintained <br>
-
All food items cleared and areas disinfected to avoid infestation of pests<br>
Students canteen
-
All Areas are well cleaned before and after service<br>
-
If kitchen in use inventory has to be carried out with regards to applicances used pertains to school or catering co<br>
-
Checks on school appliance and appropraite maintenance to be carried out<br>
-
Canteen is ventilated and temp controlled <br>
-
All furnitures are safe to use without sharp corners splinters no sharp metal turnouts<br>
-
Sufficient fly o killers are in place<br>
-
No storage items in the seating area<br>
-
No Cardboard boxes in Canteen
-
Grease trap cleaning contract where ever provided<br>
-
Flooring in good order
-
Ceiling properly secured in level
Lifts
-
Elevator connected to CDA 24/7
-
Elevator car conditions,
-
Well illuminated
-
Fans operational
-
Elevator intercom and alarm operational
-
Emergency landing device functional
-
Adequate training provided to school staff and security for evacaution in case someone stuck<br>
Fire Alarm system
-
Fire panels are connected to 24/7 CDA monitoring system <br>
-
Manual setting off alarm after school hours and ensure alarm is heard at all areas<br>
-
Cabling are secured<br>
-
All smoke and heat detectors are checked on regular basis<br>
-
Call points vandal proof<br>
-
All areas covered with smoke detectors<br>
-
External hydrants protection<br>
-
Hydrostatic tests required for aging fire extinguishers<br>
-
Sprinkler position are installed as per CDA requirements<br>
-
Changeover of Diesel pump in case of power failure<br>
-
Sufficient diesel level<br>
-
Zone control valves marked<br>
-
All access doors are interfaced with fire panels<br>
-
All central gas panel system is also interfaced with fire panel
-
All pumps lift emergency and interfaced with CDA 24/7
-
Ensure all blocks in campus are accessible to fire engines<br>
Fire Sprinkler system
-
All wet risers valve are open
-
Diesel fire pump including ventilation, exhaust, starter battery and charger<br>
-
Diesel fuel tank<br>
-
Diesel pump controller<br>
-
Jockey pump/duty pump operational<br>
-
Electric fire pump controller<br>
-
Automatic changeover panel<br>
-
Fire pump service record<br>
-
Fire pump test certificates<br>
-
Zone Flow switches and Valves (labelled and displayed)
- Yes
- No
- N/A
-
Pipe work, fixtures & fittings<br>
-
Pressure Gauges<br>
-
Fire Panel Connections from pressure switches, flow switches and valves
Fire fighting system
-
Breaching Inlet to be clear of all any items free access in case covered needs display and clean at all times<br>
-
Landing Valves need to be idendified<br>
-
Fire Hose Reels/Fire Extinguishers cabinets need to be identified and marked in fire escape plans<br>
-
Fire Hose Reels cabinets to be clear in and around 1.5mts and easy access <br>
-
Pillar Hydrants and Standpipes protection<br>
-
FM 200 Clean Agent System (if installed) monitor pressure in case triggered needs refilling<br>
Emergency lighting
-
Control panel
-
Lighting unit location
-
Cabling
-
Emergency lights operational and is identified by indicators
-
Identifying dark sports in case of power failures especially toilets
-
All toilets to have emergency lights in case of power failures
-
Self contained emergency light with exit signage
BMS
-
What are the ares controlled by BMS
-
Airconditioning
-
Lighting control
-
Water level monitoring
-
HVAC monitoring
Gas Distribution System
-
LPG panel is interfaced with fire alarm system<br>
-
Gas sensor leak detector is at proper level and checked as part of PPM<br>
-
LPG Tanks safety system sprinkler and Deluge functional<br>
-
Storage area safety<br>
-
Distribution pipe work<br>
-
Valves<br>
-
Sprinklers on tank<br>
-
Metering<br>
Sewer & Drain System
-
Periodic inspection of all Sewer lines<br>
-
Maintenance access to drainage pipes<br>
-
Camera inspection of underground sewer pipes etc.<br>
-
Holding Tank & Sewage pumps<br>
-
Manhole sleeves to basement<br>
-
Sewage Sump Pump<br>
-
Sewage/Sludge irrigation water Tank<br>
-
Storm & drain water system<br>
Air Conditioning
-
Chiller clearance/condition, in case of outdoor unit check condenser clearance<br>
-
Chiller cables secured/all sensors & transducers secured<br>
-
Chiller safety cut outs functional<br>
-
Condenser air proper ventilation <br>
-
Flow switches in place for chillers<br>
-
Chiller display easily accessible <br>
-
Access to chilled water pipes and valves<br>
-
Insulation to chill water pipes evaporators<br>
-
Ductwork & support<br>
-
Make up tank <br>
-
Chilled Water Pump<br>
-
Chilled Water Quality<br>
-
FAHU (Fresh Air Handling Unit) bag and media filters<br>
-
Distance between fresh air intake and exhaust must be over 7mts<br>
-
AHU (Air handling Units) general conditions<br>
-
FAHU (Fresh Air Handling units) general conditions
-
AHU motorised valves
-
FCU motorised valves
-
Thermostat controls
-
Exhaust Damper
-
Fresh air damper
-
Split/Condenser Units<br>
-
Condition of outdoor unit coils<br>
-
Air quality in the room<br>
-
Fresh Air supply into the room<br>
-
Air balancing and water balancing checked<br>
-
Random checks on humidity and temperature<br>
Telecommunications
-
Mobile phone reception at all areas of building
-
Mobile towers in vicinity
Recreational areas
-
Pool deck area has no stagnant water <br>
-
Circulation pump & filters<br>
-
Circulation pump & filters<br>
-
Replacement of filter media sand after certain duration time and in case issues with pressure <br>
-
Heat Pumps<br>
-
Chemical Dosing Unit<br>
-
Filtration Pump<br>
-
Water proofing in pump room<br>
-
Underwater light leak tests<br>
-
Make-up Tank<br>
-
Pool shock treatment<br>
-
Pump room secured<br>
-
Pool finish and waterproofing<br>
Football pitch
-
Pitch condition
-
Pitch lights
-
Goal posts, protection
-
Fence properly secured
-
Chain link fences end wires trimmed
Tennis court
-
Floor conditions
-
Floor line marking
-
Post net conditions<br>
-
Lights in court
Gym
-
Gym curtains<br>
-
Gym flooring<br>
-
Gym AC<br>
-
Exit doors<br>
-
Gym lights<br>
-
Exit lights<br>
-
Gym changing rooms<br>
-
Bleechers<br>
-
Changing rooms<br>
-
Roof in good condition and water sealed<br>
-
Safety padding on wall<br>
Other Outside Areas
-
All entries and exit areas are well lit during darkness
-
Height of the boundary wall to prevent intruders jumping<br>
-
Building illumination lights are functional<br>
-
Lights at entrance to reception <br>
-
landscapes<br>
-
Waste collection bins
-
School flags
-
School signages<br>
-
Recycle bins<br>
-
Security cabin<br>
-
First point of parents receiving area
O & M Manuals
-
Statutory Body approvals for MEP, technical and engineering designs<br>
-
Schedule of materials & finishes and their maintenance requirements<br>
-
Approved as-built drawings<br>
-
Common area asset register, drawings and spare parts schedule<br>
-
CDA approved plan for science lab gas system<br>
-
Provision and identification of meters for the building and common areas<br>
-
Current meters reading for electricity, chilled water, gas, and water as applicable<br>
-
Warranty and Guarantee documents<br>
-
Completion Certificates and support documents<br>
-
All statutory signage are installed at required places
Water system
-
Valves fixtures and fittings are holding
-
Tanks are well maintained without any leaks
-
Good potable water quality
-
Various tests carried out as per DM guidelines
-
Access for maintenance
-
Water tanks are always locked for security purpose
-
Water booster pumps are in good order
-
Pressure vessel tank bladder is filled with air
-
Pumps operating in cyclic mode
-
Water tanks cut off and cut in level marks on the tank wall to observe
-
NRV are functional at multiple discharge lines
-
Water treatments system if installed and functional
-
All gauges and airlock removal plugs in place at pump end
-
Floor distribution manifold
-
Sufficient water pressure in maintained across all end points
Power distribution
-
Conduits, trays and trunking<br>
-
Cable connections and to fittings and/or equipment<br>
-
Earth electrode & Earth continuity<br>
-
Earthing pit in working condition <br>
-
Equipment labelling<br>
-
LV Electrical System & MDB<br>
-
DBs are in accordance to load schedule as approved by DEWA<br>
-
LV switch-room single line connection Diagrams<br>
-
External sockets are weather proof IP rated<br>
-
Sub DBs<br>
-
Power factor meter operational all capacitor banks functional <br>
-
Sub Meter<br>
Lighting
-
Lighting levels in classrooms/ corridors/ other areas are well lit<br>
-
Luminaires are all replaced by LED<br>
-
All light fittings recessed suspended are well secured
-
Installed motion sensors are functional
-
All timer control for external and internal are adjusted as per seasonal changes
All water system
-
Water tanks check for wall conditions
-
Float valves are funcitonal and secured<br>
-
Frequency of cleaning <br>
-
Test reports<br>
-
Follow up on test reports in case of failures<br>
-
Coolers/ UV system
Landscaping
-
All areas to be appealing with lively plants and shrubs<br>
-
Monitoring of water conditions in case of TSE<br>
-
Identifying potential dangerous plants <br>
-
Health and safety issues with thorns or barks<br>
Garbage area
-
All bins are easily moved to discharge van
-
Areas in and around bin stored cleaned disinfected
-
In case its stored inside the bldg proper AC temp to maintained
-
All Food waste need to be properly secured and disposed in the bin
-
Proper schedule cleaning of the bins
-
Any maintenance on the bin wheels
Signature Sheet
-
Add signature