Title Page

    Roof
  • Edge protection

  • Parapet walls and concreate plinths

  • Access ladders and platforms

  • Anchorage points

  • Waterproofing

  • Expansion joints penetrations

  • Drainage

  • Water pipes insulation

  • Ac pipes insulation

  • Power cables secured

Lighting protection

  • Conductor installation is properly earthed.

  • All connections secured at joints

  • Lighting arrester pole is secured at base

Earthing protection

  • Earth pit checked and maintained

  • Earth continuity

  • Voltage between Earth and Neutral is .3V

  • Exterior surfaces
  • Facade and frameworks

  • External cracks

  • Glazing and windows

  • Paint conditions

  • Shades/pergolas properly secured anchored, including foundations bolts exposed

  • Cladding secured and sealed

  • All floor levels maintained as per DUDC guidelines of 5mm

  • Ramp wheel chair access as per DUDC guidelines

Class rooms

  • All glass panels are visually protected and signage placed at low levels

  • All electrical outlets are PAT tested twice a year

  • Storage cabinets are secured properly onto the wall including shelves or any suspensions

  • Light conditions

  • False ceiling secured

  • Absence of moisture and ceiling mildew

  • AC supply and return grills cleaned

  • Check exhaust & fresh Air supply if available<br>

  • Proper circulation of AC <br>

  • Air temp and humidity levels<br>

Corridors

  • Zone control valves are well marked just below the false cieling

  • Entire area well lit and sensors on with emergency lights at regular intervals <br>

  • Floor coverings well in place all joints secured expansion joints caps secured on walls<br>

  • Wall coverings, ceiling tiles, Corridor painting/skirtings<br>

  • All grills and light fitting cleaned<br>

  • All wall hangings and decoration placed in a manner CCTV view is not blocked<br>

  • Floorings are slip resistance<br>

Stair cases

  • Step edges has antislips in grooves or antislip 3M tapes<br>

  • Stair case pressuring units functional (wherever provided)<br>

Public areas internal

  • Sufficient landing between the main entrance doors and steps <br>

  • Easy access ramp for wheel chair <br>

  • Sufficient clearance is maintained at main door from floor to avoid rubbing floor<br>

  • Signages are ear marked for offices, toilets and other areas<br>

  • Detectors functonal with pulse indications<br>

  • All control panels visible and functional at reception area ( fire alarm, gas panel)<br>

  • All possible places to install no hold door closers for glass doors<br>

Storage rooms

  • All items inventory lists are kept in storage rooms

  • All storage room has to be marked with yellow round stickers to ensure its always locked

  • Storage are well ventilated.

  • Non serviceable items not to be stored

  • Combustible items / Acid and corrosive items to be stored separately with proper ventilation and identification ( MSD to be displayed) esp pool chemicals<br>

Public area external

  • Check in at guard room sufficient place for visitors to sign in preferably shaded area<br>

  • Visitor entry register are in good condition not shatered and worn out<br>

  • Access from Car parks to school building surroundings are clear and clean<br>

  • Access motorised gates are well maintained regularly <br>

  • All gradients are within specifics of DUDC<br>

  • Landscping are well maintained looks lively and well nourished all dead leaves removed dates old leaves trimmed<br>

  • Way signs from car park to the required destinations are well displayed especilaly assembly points<br>

  • All hill curbs manholes painted and in clean conditions in level without any trip hazard<br>

  • All external lights including bollard lights cleaned and aligned. Night illuminations are in operational conditions.<br>

  • Entrance door push pull signs<br>

  • Sufficient clearance is maintained between door and handle to avoid finger strike<br>

  • Sufficient clearance is maintained between door and handle to avoid finger strike<br>

  • Aluminium door frames areas between moving and stationary are cleaned brushes in place air leaks sealed<br>

  • All exhaust and fresh air grills at basement carpark area well cleaned dusted & painted off from rust, any crack repairs leakges are attended periodically

  • All boundary lights are installed and working<br>

  • Pavement tiles are in level and proper separation from plot limits<br>

  • Privacy screen where ever required are in place<br>

  • Shades pergolas are in good conditions with all steel ropes in place and base plate secured<br>

  • Water coolers are covered and inside surroundings clean, installed for high grade filters<br>

  • All electricals cables/ CCCTV cables/AC pipes well concealed in GI trunking and not visible<br>

  • Tall trees well secured/ no trip hazards<br>

  • Car Parks and other areas well illuminated during nights <br>

  • Motion Sensors on and functional for basement parkings

Reception area

  • Furnitures well placed<br>

  • Rulers pictures well displayed within guidelines <br>

  • AC grills lights cleaned and working<br>

  • Indoor plants well nourished and trimmed<br>

  • All glass panels doors are cleaned and vision protected for all heights<br>

  • Entire area well lit<br>

  • Fire panel/Gas panel/emergency lights functional well visible and are clear off for easy access<br>

  • Panic alarm light and alarm functional and visible<br>

  • Visitors seating in good order, walls painted with students art work display<br>

  • Visitors toilets cleaned with proper cleaning check list schedules<br>

  • Reception area temp well maintained with contiunous air flow<br>

  • External door mat in place to prevent dust entering in <br>

Staff canteen/Pantry

  • Pantry is well cleaned with proper exhaust<br>

  • Flooring in good order<br>

  • Sink tops are clear of water moisture<br>

  • Splash guard around sink to avoid water seepage into the cabinet to avoid fungus or mold <br>

  • Electrical outlets not overloaded with adaptors<br>

  • Fly O killer in place and maintained <br>

  • All food items cleared and areas disinfected to avoid infestation of pests<br>

Students canteen

  • All Areas are well cleaned before and after service<br>

  • If kitchen in use inventory has to be carried out with regards to applicances used pertains to school or catering co<br>

  • Checks on school appliance and appropraite maintenance to be carried out<br>

  • Canteen is ventilated and temp controlled <br>

  • All furnitures are safe to use without sharp corners splinters no sharp metal turnouts<br>

  • Sufficient fly o killers are in place<br>

  • No storage items in the seating area<br>

  • No Cardboard boxes in Canteen

  • Grease trap cleaning contract where ever provided<br>

  • Flooring in good order

  • Ceiling properly secured in level

Lifts

  • Elevator connected to CDA 24/7

  • Elevator car conditions,

  • Well illuminated

  • Fans operational

  • Elevator intercom and alarm operational

  • Emergency landing device functional

  • Adequate training provided to school staff and security for evacaution in case someone stuck<br>

Fire Alarm system

  • Fire panels are connected to 24/7 CDA monitoring system <br>

  • Manual setting off alarm after school hours and ensure alarm is heard at all areas<br>

  • Cabling are secured<br>

  • All smoke and heat detectors are checked on regular basis<br>

  • Call points vandal proof<br>

  • All areas covered with smoke detectors<br>

  • External hydrants protection<br>

  • Hydrostatic tests required for aging fire extinguishers<br>

  • Sprinkler position are installed as per CDA requirements<br>

  • Changeover of Diesel pump in case of power failure<br>

  • Sufficient diesel level<br>

  • Zone control valves marked<br>

  • All access doors are interfaced with fire panels<br>

  • All central gas panel system is also interfaced with fire panel

  • All pumps lift emergency and interfaced with CDA 24/7

  • Ensure all blocks in campus are accessible to fire engines<br>

Fire Sprinkler system

  • All wet risers valve are open

  • Diesel fire pump including ventilation, exhaust, starter battery and charger<br>

  • Diesel fuel tank<br>

  • Diesel pump controller<br>

  • Jockey pump/duty pump operational<br>

  • Electric fire pump controller<br>

  • Automatic changeover panel<br>

  • Fire pump service record<br>

  • Fire pump test certificates<br>

  • Zone Flow switches and Valves (labelled and displayed)

  • Pipe work, fixtures & fittings<br>

  • Pressure Gauges<br>

  • Fire Panel Connections from pressure switches, flow switches and valves

Fire fighting system

  • Breaching Inlet to be clear of all any items free access in case covered needs display and clean at all times<br>

  • Landing Valves need to be idendified<br>

  • Fire Hose Reels/Fire Extinguishers cabinets need to be identified and marked in fire escape plans<br>

  • Fire Hose Reels cabinets to be clear in and around 1.5mts and easy access <br>

  • Pillar Hydrants and Standpipes protection<br>

  • FM 200 Clean Agent System (if installed) monitor pressure in case triggered needs refilling<br>

Emergency lighting

  • Control panel

  • Lighting unit location

  • Cabling

  • Emergency lights operational and is identified by indicators

  • Identifying dark sports in case of power failures especially toilets

  • All toilets to have emergency lights in case of power failures

  • Self contained emergency light with exit signage

BMS

  • What are the ares controlled by BMS

  • Airconditioning

  • Lighting control

  • Water level monitoring

  • HVAC monitoring

Gas Distribution System

  • LPG panel is interfaced with fire alarm system<br>

  • Gas sensor leak detector is at proper level and checked as part of PPM<br>

  • LPG Tanks safety system sprinkler and Deluge functional<br>

  • Storage area safety<br>

  • Distribution pipe work<br>

  • Valves<br>

  • Sprinklers on tank<br>

  • Metering<br>

Sewer & Drain System

  • Periodic inspection of all Sewer lines<br>

  • Maintenance access to drainage pipes<br>

  • Camera inspection of underground sewer pipes etc.<br>

  • Holding Tank & Sewage pumps<br>

  • Manhole sleeves to basement<br>

  • Sewage Sump Pump<br>

  • Sewage/Sludge irrigation water Tank<br>

  • Storm & drain water system<br>

Air Conditioning

  • Chiller clearance/condition, in case of outdoor unit check condenser clearance<br>

  • Chiller cables secured/all sensors & transducers secured<br>

  • Chiller safety cut outs functional<br>

  • Condenser air proper ventilation <br>

  • Flow switches in place for chillers<br>

  • Chiller display easily accessible <br>

  • Access to chilled water pipes and valves<br>

  • Insulation to chill water pipes evaporators<br>

  • Ductwork & support<br>

  • Make up tank <br>

  • Chilled Water Pump<br>

  • Chilled Water Quality<br>

  • FAHU (Fresh Air Handling Unit) bag and media filters<br>

  • Distance between fresh air intake and exhaust must be over 7mts<br>

  • AHU (Air handling Units) general conditions<br>

  • FAHU (Fresh Air Handling units) general conditions

  • AHU motorised valves

  • FCU motorised valves

  • Thermostat controls

  • Exhaust Damper

  • Fresh air damper

  • Split/Condenser Units<br>

  • Condition of outdoor unit coils<br>

  • Air quality in the room<br>

  • Fresh Air supply into the room<br>

  • Air balancing and water balancing checked<br>

  • Random checks on humidity and temperature<br>

Telecommunications

  • Mobile phone reception at all areas of building

  • Mobile towers in vicinity

Recreational areas

  • Pool deck area has no stagnant water <br>

  • Circulation pump & filters<br>

  • Circulation pump & filters<br>

  • Replacement of filter media sand after certain duration time and in case issues with pressure <br>

  • Heat Pumps<br>

  • Chemical Dosing Unit<br>

  • Filtration Pump<br>

  • Water proofing in pump room<br>

  • Underwater light leak tests<br>

  • Make-up Tank<br>

  • Pool shock treatment<br>

  • Pump room secured<br>

  • Pool finish and waterproofing<br>

Football pitch

  • Pitch condition

  • Pitch lights

  • Goal posts, protection

  • Fence properly secured

  • Chain link fences end wires trimmed

Tennis court

  • Floor conditions

  • Floor line marking

  • Post net conditions<br>

  • Lights in court

Gym

  • Gym curtains<br>

  • Gym flooring<br>

  • Gym AC<br>

  • Exit doors<br>

  • Gym lights<br>

  • Exit lights<br>

  • Gym changing rooms<br>

  • Bleechers<br>

  • Changing rooms<br>

  • Roof in good condition and water sealed<br>

  • Safety padding on wall<br>

Other Outside Areas

  • All entries and exit areas are well lit during darkness

  • Height of the boundary wall to prevent intruders jumping<br>

  • Building illumination lights are functional<br>

  • Lights at entrance to reception <br>

  • landscapes<br>

  • Waste collection bins

  • School flags

  • School signages<br>

  • Recycle bins<br>

  • Security cabin<br>

  • First point of parents receiving area

O & M Manuals

  • Statutory Body approvals for MEP, technical and engineering designs<br>

  • Schedule of materials & finishes and their maintenance requirements<br>

  • Approved as-built drawings<br>

  • Common area asset register, drawings and spare parts schedule<br>

  • CDA approved plan for science lab gas system<br>

  • Provision and identification of meters for the building and common areas<br>

  • Current meters reading for electricity, chilled water, gas, and water as applicable<br>

  • Warranty and Guarantee documents<br>

  • Completion Certificates and support documents<br>

  • All statutory signage are installed at required places

Water system

  • Valves fixtures and fittings are holding

  • Tanks are well maintained without any leaks

  • Good potable water quality

  • Various tests carried out as per DM guidelines

  • Access for maintenance

  • Water tanks are always locked for security purpose

  • Water booster pumps are in good order

  • Pressure vessel tank bladder is filled with air

  • Pumps operating in cyclic mode

  • Water tanks cut off and cut in level marks on the tank wall to observe

  • NRV are functional at multiple discharge lines

  • Water treatments system if installed and functional

  • All gauges and airlock removal plugs in place at pump end

  • Floor distribution manifold

  • Sufficient water pressure in maintained across all end points

Power distribution

  • Conduits, trays and trunking<br>

  • Cable connections and to fittings and/or equipment<br>

  • Earth electrode & Earth continuity<br>

  • Earthing pit in working condition <br>

  • Equipment labelling<br>

  • LV Electrical System & MDB<br>

  • DBs are in accordance to load schedule as approved by DEWA<br>

  • LV switch-room single line connection Diagrams<br>

  • External sockets are weather proof IP rated<br>

  • Sub DBs<br>

  • Power factor meter operational all capacitor banks functional <br>

  • Sub Meter<br>

Lighting

  • Lighting levels in classrooms/ corridors/ other areas are well lit<br>

  • Luminaires are all replaced by LED<br>

  • All light fittings recessed suspended are well secured

  • Installed motion sensors are functional

  • All timer control for external and internal are adjusted as per seasonal changes

All water system

  • Water tanks check for wall conditions

  • Float valves are funcitonal and secured<br>

  • Frequency of cleaning <br>

  • Test reports<br>

  • Follow up on test reports in case of failures<br>

  • Coolers/ UV system

Landscaping

  • All areas to be appealing with lively plants and shrubs<br>

  • Monitoring of water conditions in case of TSE<br>

  • Identifying potential dangerous plants <br>

  • Health and safety issues with thorns or barks<br>

Garbage area

  • All bins are easily moved to discharge van

  • Areas in and around bin stored cleaned disinfected

  • In case its stored inside the bldg proper AC temp to maintained

  • All Food waste need to be properly secured and disposed in the bin

  • Proper schedule cleaning of the bins

  • Any maintenance on the bin wheels

Signature Sheet

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.