Title Page
-
Employee Name
-
Trained By
-
Conducted on
Foreman Training
Every home is provided with a site specific Roof Railing Plan indicating the total number of components needed for the project and the installation location of each component.
-
Does Employee demonstrate<br>understanding of Roof Railing Plan
The on-site foreman is responsible for installing fall protection at stairwells and volume ceilings. Installers must sign off on the "Nets" section of the "Roof Railing Plan" sign-in sheet.
-
Foreman understands responsibility to install fall protection at stair wells and volume ceilings.
-
Foreman understands that Installers must sign off on the "Nets" section of the "Roof Railing Plan" sign-in sheet.
Safety nets and or properly built platforms must be used to protect stair wells and or volume ceilings. A properly built platform must be supported by a ledger with joists at 24" on center.
-
Foreman understands only safety nets and properly built platforms are to be used at stair wells and or volume ceilings
Foreman must verify that the Roof Railing Plan is adhered to. Foreman must also collect signature of all employees working on the home on the Roof Railing Plan.
-
Foreman understands responsibility to verify Roof Railing Plan is adhered to
-
Foreman understands responsibility to collect signatures on the Roof Railing Plan
Sign Off
-
Employee signature
-
Trainer signature
-
Training information provided in Spanish translation. Initial