Title Page

  • Employee Name

  • Trained By

  • Conducted on

Every home is provided with a site specific Roof Railing Plan indicating the total number of components needed for the project and the installation location of each component.

  • Does Employee demonstrate understanding of Roof Railing Plan

All system components must be inspected prior to being used, every time before each use.

  • Stacker Brackets, Clamps, Posts, and End Gates must inspected for any damage including but not limited to broken welds, bent components, or stripped threads.

  • Does employee inspect all system components prior to installation.

  • Planks must be inspected for splits, delamination, saw kerfs, notches, holes, face breaks, etc.

  • Employee inspects plank prior to usage?

After inspecting all required system components we can begin to assemble them.

  • Stacker brackets must assembled with a 36 inch support brace even at sheer wall locations

  • Employee correctly assembles Stacker Bracket?

  • Install Stacker Bracket at the predesignated spot from the Roof Railing Plan

  • Employee safely hangs completed Support Bracket?

  • Install Guardrail Posts, Scaffold Planks and Guardrails. First Set of Posts, Planks and Guardrails must be installed from a secured ladder.

  • Employee safely installs Guardrail Posts?

  • Employee safely installs scaffold planks?

  • Employee safely installs guardrails?

  • Install End Rails at all system run termination points.

  • Employee safely installs End Rails?

  • With full hip roofs, brackets are placed all the way around the top plate with corners connected on a 45. End rails are not necessary on hip roof.

  • Employee safely installs plank at hip corners?

Prior to Disassembly: Ensure all necessary carpentry is complete

  • Remove rails, uprights, and planks while working in reverse direction of installation. Stack material on roof jacks, or lower to the ground.

  • Employee safely removes system components?

  • Remove Stacker Bracket from wall by loosing clamp from stacker bracket.

  • Employee safely removes Bracket System at sheer wall?

  • Employee safely removes Bracket System at non sheer wall locations?

  • Clean up is vital! Ensure all system components are returned to their proper storage box.

  • Employee picks up and properly stores all system components ?

  • Take a picture of Employee with hard hat sticker

  • Employee signature

  • Trainer signature

  • Training information provided in Spanish translation. Initial

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.