Takes place on 21/06/2023
-
Prepared by Pablo Moreno.
-
Siemens Energy Paulsternstr. 26 13629 Berlin
Factory Acceptance Test SG (8VM1)
a-Visual Inspection
-
1-Surfaces undamaged
-
2-Designation labels available and correct
-
3-Rating plate available and executed correctly
-
4-Earthing balls and earthing busbars available
-
5-Cable compartment -XB1: Voltage indicator VDS available.
-
6-Cable compartment -XB2: Voltage indicator VDS available.
-
7-Cable compartment -XB3: Voltage indicator FPI available.
-
8-Cable compartment -XB3: Voltage indicator VDS available.
-
9-LV equipment acc. to circuit diagram.
-
10-Current transformer rating acc. to circuit diagram
-
11-All phase labels are available and correct
-
12-Bottom plates including cable cleats in the -XB2 cable compartment included and according to specification (BayConf.)
-
13-Bottom plates including cable cleats in the -XB3 cable compartment included and according to specification (BayConf.)
-
14-SIPROTEC Mimic diagrams correct
-
15-Tool box available and complete (If it will delivered separate a sample will show).
-
16-Check of repair kit and desiccant bags.
-
17-Check of Acceleration sensors-sample.
-
18-Check of Short-Circuit plugs for VDS (toolbox)/ sample.
-
19-Check frame bolts.
-
20-Project specific labels are according specification.
-
21-Deviations
b-Function Test: Interface In & Outputs to WTC
-
1-Connection of Power Supply -230V AC
-
2-Connection of Power Supply -110V DC
-
3-Close/Interlock from WTC
-
4-Local/Remote from WTC
-
5-Local/Remote switch
-
6-Circuit-breaker operations and commands
-
7-3-position drives (manual & electrical) operations and commands
-
8-Gas low
-
9-Gas too low
-
10-CB tripped
-
11-110V DC supervision monitoring
-
12-MCB trip swithgear
-
13-Aux. voltage supervision AC 230V
-
14-On-spring charged / motor runtime supervision
-
15-Prot. Relay not tripped (7SR45)
-
16-No int. relay failure (7SR45).
-
17-Inten. Relay failure (7SJ85).
-
18-Trip circuit supervision (7SJ85).
-
19- Trip signal 1 (7SJ85).
-
20- Trip signal 2 (7SJ85).
-
21-Auto reclose/SST check
-
22-External trip WTC.
-
23-External trip transformer
-
24- VDS failure.
-
25- EF-Isolated Network.
-
26-Deviations
c-Secundary Injection Test- 7SR45- Self-powered Relay
-
1- Test #1 I>
-
2- Test #2 I>
-
3-Test #3 I>
-
4-Test #1 I>>
-
5-Test #1 Inrush Restraint.
-
6-Test #2 Inrush Restraint.
-
7-Test #3 Inrush Restraint.
-
8-Test #4 Inrush Restraint.
-
9-Test #5 Inrush Restraint (Imax).
-
10-Test #6 Inrush Restraint (Imax).
-
11- Test #1 IG>>
-
12-Deviations:
c-Secundary Injection Test- 7SJ85- Multifunction Relay
-
1- Test #1 I>
-
2- Test #2 I>
-
3-Test #3 I>
-
4-Test #1 I>>
-
5-Test #1 Inrush Restraint.
-
6-Test #2 Inrush Restraint.
-
7-Test #3 Inrush Restraint.
-
8-Test #4 Inrush Restraint.
-
9-Test #5 Inrush Restraint (Imax).
-
10-Test #6 Inrush Restraint (Imax).
-
11- Test #1 IG>>
-
12-Deviations:
d-Primary Injection Test
-
1- Test #1 7SJ85- Trip verification 120A.
-
2-Test #1 7SR45- Trip verification 70A.
-
3-Test #1 7SJ85 & 7SR45- connection check 50A.
-
4-Test #1 7SJ85 & 7SR45- connection check 80A.
-
5-Deviations:
e-Fault Passage Indicator (FPI).
-
1-Test #1- verify labeling.
-
2-Test #2- verify device status.
-
3- Test #3 - verify power supply.
-
4-Test #4- no IE>activation.
-
5-Test #5- IE>activation.
-
6-Test #6- No I>activation.
-
7-Test #7 I>activation.
-
8-Deviations:
-
undefined
f-Voltage Detection System (VDS).
-
1- VDS broken lead detection.
-
2-VDS self-test.
-
3-VDS Primary injection of High Voltage.
-
4-VDS Signal test.
-
5-Deviations:
g-Interlocking ( acc. to drawings).
-
1- Interlocking conditions CB Open.
-
2-Interlocking conditions CB Close.
-
3- Trafo Key (-QZ91).
-
4-Interlocking conditions Disconnector & Earthing switch.
-
5- Interlocking conditions local/remote switch.
-
6-Interlocking cable compartment cover.
-
7-Interlocking Auto-Reclose/SST.
-