Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

QUICK ESKOM SITE INSPECTION

SITE OVERVIEW

  • Road/Roads leading up to the tower

  • Full site overview from the ground

  • All angles of the fence from the ground

  • Area around all the stay wires

  • Is the pole number the same as what the office has on record?

  • Other (Images)

  • Comments

BATTERY BOX

  • Entire outside of the battery box, All angles are to be included

  • Entire inside of the battery box, All angles are to be included

  • All bosal leading to the tower. If the bosals are concreted, include imagery of it

  • All batteries. Indicate the 3 link system

  • Battery dates

  • Are the individual battery voltages the same?

  • Are the draws between the battery leads the same?

  • Is the voltage on the batteries the same as the App?

  • If No to above question, specify the difference

  • What is the draw to the equipment from the batteries

  • Other (Images)

  • Comments

CHARGER

  • Charger type

  • Is the charger output voltage set to between 27.5 and 27.8V?

  • Eskom DB Box

  • Other (Images)

  • Comments

SECURITY CAMERA

  • Is the security camera lens cleaned, positioned correctly and above 3m?

  • Other (Images)

  • Comments

LATTICE MAST

  • Are the stay wire points on the tower in good condition?

  • If No to above, please specify and attach images to "other" question below

  • Imagery of the base of the tower

  • Is there a fall arrest installed

  • Other (Images)

  • Comments

MAN LOOKOUT

  • Are the stay wire points on the tower in good condition?

  • If No above question, please specify and include imagery in "other" question below

  • Imagery to the base of the tower

  • Other (Images)

  • Comments

ANODES

  • Are the anodes functioning correctly?

  • Images of all the anodes

  • Other (Images)

  • Comments

EARTHING

  • Is the equipment in the equipment box earthed to a single point in the box, which when has an external point that goes down to the same point (single point) as the other equipment? (If it is in the battery box)

  • Does all tower bases have earth straps/cables going into the ground?

  • Are all stay wires earthed to the ground?

  • Are all battery boxes earthed to the ground with an earth rod?

  • Attach images for all above mentioned points

  • Other (Images)

  • Comments

OVERALL

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.