Title Page

  • CUA No.

  • Nominated Date & Time

  • Inspection Address
  • Inspection Requested by

  • Contact No.

  • Inspection Conducted on

Preliminary requirements

  • Works required by previous inspections carried out

  • Certificates

  • Surveys

  • Are all works completed

  • Preliminary Requirements

Adequacy of Structure

  • Termite barriers in place

  • Termite notice in meter box

  • Lighting, ventilation, room size

  • Drainage

  • Floor/ceiling heights

  • Window security Bedroom/Habitable room

  • Disabled access & facilities

  • Egress

  • Essential services including signage & safety statement, Fire safety

  • Stair, handrail, balustrades

  • BASIX commitments checked

  • Are energy efficiency matters ok/certified

  • Are smoke alarms interconnected & correctly placed

  • Lift-off hinges to sanitary compartments

  • Bushfire BAL level compliance

  • Adequacy of Structure

Site Works

  • Setbacks from boundary

  • Access and driveways

  • Land stability and erosion

  • Fencing

  • Landscaping/trees

  • Footpath/Nature Strip

  • Road

  • Bushfire APZ provided

Finalisation

  • Compliance with condition of development consent

  • Issue BASIX Completion Receipt

  • Check for outstanding fees noted on file

  • Issue Occupation Certificate

  • Forward required certificates to Council

Comments

  • Comments

  • Photos

Signature

  • Recorded on computer

  • Inspector's Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.