Information
-
Fire Ant Inspection -
-
Site
-
Conducted on
-
Prepared by
Inspection are to be carried out every 28 days
1.0 - High Risk Areas
-
1.1 - Are storage areas and/or site containers free from FA?
-
1.2 - Are the perimeters of buildings free from FA?
-
1.3 - Is the perimeter of site free from FA?
-
1.4 - Are gardens or grassed areas free from FA?
-
1.5 - Are the bare soil areas free from FA?
-
1.6 - Are stockpiles free from FA?
-
1.7 - Are mulched areas free from FA?
-
1.8 - Have any materials been taken on/off site? If yes, where and by who?
2.0 - Clearance
-
2.1 - Is the site contaminated with FA?
-
2.2 - Are there suspected FA?
-
2.3 - Is the site clear from FA?
Sign Off
-
Inspector's signature