Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Fire Safety Installations.
-
Emergency Lifts
-
Access Panels through fire rated construction<br>
-
Emergency Lighting
-
Emergency Power Supply
-
Emergency Warning and Intercomunication System
-
Exit Signage
-
Fire Control Centre
-
Fire Curtains
-
Fire Dampers
-
Fire Detection/Alarm System
-
Fire Doors
-
Fire Extinguishers
-
Fire Hose Reels
-
Fire Hydrants
-
Air Handling Systems
-
Fire Mains
-
Fire Pumps
-
Fire Hydrant Booster Assembly
-
Fire Shutters
-
Fire Windows
-
Protection of Penetrations through Fire Rated Construction
-
Smoke and Heat Venting Systems
-
Smoke Exhaust Systems
-
Smoke Door Sets
-
Solid Core Doors
-
Special Automatic Suppression Systems ( Gas,Powder etc.)
-
Stairwell Pressurisation Systems
-
Structural Fire Protection
-
Systems required to have a Fire Resistance Level.
-
Other Features.
Fire Indicator Panel.
-
Monthly Testing
-
Annual Test carried out? Date.
-
Outstanding Defects.
-
Critical Defects?
Aspirating System
-
Monthly testing last 12 months.
-
6 and 12 monthly testing.
Sound Systems
-
Monthly Testing.
-
6 and 12 monthly testing.
-
Critical defects ?
Intercom System
-
Monthly Testing.
-
6 and 12 monthly testing.
-
Critical defects?
Sprinkler Systems.
-
Monthly Testing.
-
3,6 & 12 Month Testing.
-
Other required testing?
-
Critical defects?
Pre-action Systems
-
3,6 & 12 Month Testing.
Wall wetting Systems.
-
3,6 & 12 Month Testing.
Pump Systems
-
Monthly Testing.
-
Other required testing.
Certificate of Classification.
-
C. Of C. Displayed?
-
Follow-up required?
Hazard Classification.
-
Special Hazards?
Fire Extinguishers
-
Test Dates?
Fire Blankets
-
Test Dates?
Fire Hose Reels
-
Test Dates?
Fire Hydrants
-
Test Dates?
-
Hydrostatic Test Dates?
FireTrace Systems
-
Test Dates?
Missed Service Reports.
-
Follow-up required?
Emergency Lighting
-
Adequate? compliant?
Evacuation Diagrams
-
Diagram dates.
-
Additional required?
Additional follow-up required?
-
Follow-up?