Title Page
-
Site conducted
-
B0475 (all extrusion lines), Issue 1 Jun 2019
-
Date
-
Line Number
-
Order Number
First off Sign Off
-
To be Completed by Second Person Other Than Line Operator
-
To be Checked Before Good make
Machine Checks
-
Operator
-
Checked By
Line
-
Have All Pipework, Blenders and Silo Connections been physically checked by the person carrying out the fist off sign off ?
-
Is it correct to the Job Card
-
Has an OIR been raised.
-
OIR Number
-
Is the order running to the correct weight (Nominal or Yield) E.g Feedstock is always run to Nominal & NH is run to Yield
-
Has blend been checked by the Operator and Blend Sheet Filled In
-
Are Settings on Condition Sheet/Extrol/Varex being Adhered To
-
Is Gauge Setting in Plast Control as per Production Manual/Yield sheet
-
Is Clock Setting on Winder as per Production Manual/ Yield Sheet
-
Is Film Appearance in the Web Devoid of Lines, Holes, Spray of Windows, Bands, Striations
Product Checks
-
Operator
-
Checked by
-
To be Checked at the End of First Set
-
Reel Weights allowed as per Production Manual, and Where Applicable input into Automation
-
Reel Widths Actual
-
Reel 1
-
Reel 2
-
Reel 3
-
Reel 4
-
Reel 5
-
Reel 6
-
Reel 7
-
Reel 8
-
Reel 9
-
Reel 10
-
Reel 11
-
Reel 12
Reel and Box Label Detail
-
Correct Packaging Reel Label being used
-
Correct Position Reel Label where used
For Boxed/Sleeved Products Only
-
Box/Sleeve Labels in Correct Place
-
Details on Box/Sleeve Labels correct as to Production Order
-
Reel Placement correct on all Manual and Automated Pallets
-
Wrapping Not Crushing Boxes
-
If the Running of this Order is Good to Proceed Please Sign Below
-
Reason if Delayed
-
If this Order is Not to Proceed, Please Explain Below
-
Problems Before Goodmake, Which has Stopped the Order Being Started
-
Action to Rectify
-
Is the Order Now
Please Pick One Below
-
Is the order
-
Signature
Line Clearance process Check List
-
Has the works order from the previous job been removed?
-
Has the Blend Sheet from the previous order been removed?
-
Have all old pallets tags and reel labels been removed?
-
Have the labels from the previous job been removed (Non-Automated Lines Only)?
-
Have all raw materials that are no longer required been removed / drained from hoppers?
-
Have all packaging materials no longer required been removed from the line?
Line/ Order recheck
-
Reason for recheck This Section must only be completed by a shift manager/ team leader and is only filled in if there has been a request to change the blend of if the line has been off resulting in running conditions to be change i.e heat profile or engineering tension checks etc.
-
-
Person Carrying out the recheck
- D Tulinski
- K Ryan
- P Peryt
- A Caldicott
- K Novak
- D Prime
- L Savage
- P Grzywaczeski
- M Smith
- L Baka
- G Klimczok
- K Kelly
- M Evans
-
Have All Pipework, Blenders and Silo Connections been physically checked by the person carrying out the fist off sign off ?
-
Has this been checked by the Operator and Blend Sheet Filled In
-
Are Settings on Condition Sheet/Extrol/Varex being Adhered To
-
Is Gauge Setting in Plast Control as per Production Manual/Yield sheet
-
Is Clock Setting on Winder as per Production Manual/ Yield Sheet
-
Is Film Appearance in the Web Devoid of Lines, Holes, Spray of Windows, Bands, Striations
-
Signed off by shift manager/ Team Leader