Title Page

  • Site conducted

  • B0475 (all extrusion lines), Issue 1 Jun 2019

  • Date

  • Line Number

  • Order Number

First off Sign Off

  • To be Completed by Second Person Other Than Line Operator

  • To be Checked Before Good make

Machine Checks

  • Operator

  • Checked By

Line

  • Have All Pipework, Blenders and Silo Connections been physically checked by the person carrying out the fist off sign off ?

  • Is it correct to the Job Card

  • Has an OIR been raised.

  • OIR Number

  • Is the order running to the correct weight (Nominal or Yield) E.g Feedstock is always run to Nominal & NH is run to Yield

  • Has blend been checked by the Operator and Blend Sheet Filled In

  • Are Settings on Condition Sheet/Extrol/Varex being Adhered To

  • Is Gauge Setting in Plast Control as per Production Manual/Yield sheet

  • Is Clock Setting on Winder as per Production Manual/ Yield Sheet

  • Is Film Appearance in the Web Devoid of Lines, Holes, Spray of Windows, Bands, Striations

Product Checks

  • Operator

  • Checked by

  • To be Checked at the End of First Set

  • Reel Weights allowed as per Production Manual, and Where Applicable input into Automation

  • Reel Widths Actual

  • Reel 1

  • Reel 2

  • Reel 3

  • Reel 4

  • Reel 5

  • Reel 6

  • Reel 7

  • Reel 8

  • Reel 9

  • Reel 10

  • Reel 11

  • Reel 12

Reel and Box Label Detail

  • Correct Packaging Reel Label being used

  • Correct Position Reel Label where used

For Boxed/Sleeved Products Only

  • Box/Sleeve Labels in Correct Place

  • Details on Box/Sleeve Labels correct as to Production Order

  • Reel Placement correct on all Manual and Automated Pallets

  • Wrapping Not Crushing Boxes

  • If the Running of this Order is Good to Proceed Please Sign Below

  • Reason if Delayed

  • If this Order is Not to Proceed, Please Explain Below

  • Problems Before Goodmake, Which has Stopped the Order Being Started

  • Action to Rectify

  • Is the Order Now

Please Pick One Below

  • Is the order

  • Signature

Line Clearance process Check List

  • Has the works order from the previous job been removed?

  • Has the Blend Sheet from the previous order been removed?

  • Have all old pallets tags and reel labels been removed?

  • Have the labels from the previous job been removed (Non-Automated Lines Only)?

  • Have all raw materials that are no longer required been removed / drained from hoppers?

  • Have all packaging materials no longer required been removed from the line?

Line/ Order recheck

  • Reason for recheck This Section must only be completed by a shift manager/ team leader and is only filled in if there has been a request to change the blend of if the line has been off resulting in running conditions to be change i.e heat profile or engineering tension checks etc.

  • Person Carrying out the recheck

  • Have All Pipework, Blenders and Silo Connections been physically checked by the person carrying out the fist off sign off ?

  • Has this been checked by the Operator and Blend Sheet Filled In

  • Are Settings on Condition Sheet/Extrol/Varex being Adhered To

  • Is Gauge Setting in Plast Control as per Production Manual/Yield sheet

  • Is Clock Setting on Winder as per Production Manual/ Yield Sheet

  • Is Film Appearance in the Web Devoid of Lines, Holes, Spray of Windows, Bands, Striations

  • Signed off by shift manager/ Team Leader

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.