  • Site conducted

  • Conducted on

  • Prepared by

Resolved issues

  • Dehuller dust bin has enclosed room now to collect dust and the hole above has been patched. A separate dust extraction system will be added in future to reduce the dust within the room.

    resolved dehuller bin.PNG
  • Container door #3 has been installed and the project is now complete

    Resolved Container door 3.PNG
  • Power point for scissor lift replaced in lane 2, warehouse office space is being constructed this month

    Resolved Scissor Lift.PNG
  • Use First signs have been created

    20230718_081517.jpg
  • Bulkhead 3 tunnel has been cleaned and ready for lights to be installed

    Resolved Bulkhead Tunnel.PNG
  • New Vacuum system has been ordered, waiting on delivery for installation

    Resolved Vaccuum WB.PNG

Outstanding Issues from last meeting

  • Grain transfer pipe above soft intake is still not fixed. Tape has been put around the hole but has minor leaking leading to debris on roof and slippery surface.

    20230718_080409.jpg
  • Update and ETC date ?

  • Bulkhead 2 door is still in need of repair

    unresolved bh2 door.PNG
  • Update on engineering and ETC date?

  • Pipe on bin top floor still needs repairs

    Unresolved bintop pipe.PNG
  • Have the heavy duty patches been tested and ETC?

  • Press 1 still has paneling coming loose on the inside of the door

    Unresolved Press 1 paneling.PNG
  • Maintenance have plans to weld and bolt panel back into place. is the ETC still July?

  • Estop on press floor rubbish compactor is still loose. No rush for this job and press operators have been made aware to use the isolator when working on compactor not the estop.

    unresolved estop rub comp press.PNG
  • ETC?

Maintenance Request for Production/Upcoming Projects and Scheduled Maintenance

  • 1.

  • 2.

  • 3.

  • 4.

  • 5.

  • 6.

  • 7.

Production Request/Upcoming Projects and Scheduled Cleaning

  • Would it be possible to move or add new tines slots for the choke bins on the press floor? These are capped and can only go a quarter of the way through making it difficult to get a good grasp when removing the bin from press floor forklift door. Is a platform a possibility?

    New Project bin.PNG
  • Ideas? ETC?

  • Bulkhead 1 door does not close properly, not a priority as there is no grain in this shed currently

    bulkhead 1 door new project.jpg
  • ETC?

  • Dust collection: There is currently a large amount of dust being collected and used as remix. Normally we sit at 3% dust remix usage but at times in recent weeks we have had it increase to 10%. Is there any reason for this increase? Leaks?

    20230718_075703.jpg
  • Reasons or ideas to fix excess dust collection?

  • There is a small leak on the MicroStation that needs repair. certain product leak through it profusely like isoleucine and threonine

    new project iso leak.PNG
  • ETC?

  • New storage location near grain cleaner plant for wheelbarrows and other outdoor equipment. Indoor storage will be used for pressure washers and other electrical equipment

    New storage location.PNG
  • Is this possible? and ETC?

  • There are leaks on the dust collector discharge and ingredient bin 22 on the discharge floor

    Robo Leaks.PNG
  • ETC?

  • Can these trays be emptied more regularly to avoid spills on the floor

    Robo Oil Leaks.PNG
  • Ideas?

  • Hendy's new concept for remix blower pipe to silos

    New BLower pipe.PNG
  • Will this work? or are there alternatives?

  • Can this curb be removed, is the water pump still operational?

    Curb Removal.PNG
  • ETC?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.