Title Page

  • First Work Inspection - Windows

  • The Clayton

  • Conducted on

  • Prepared by

  • Select date

General Information

  • Project

  • Building

  • Level

  • Area

Field Checklist

  • Verify pre-installation meeting is conducted and all necessary parties attended.

  • Verify all materials are per submitted and approved by the AOR.

  • Verify mock ups are completed, reviewed, and corrections and modifications are complete.

  • Review rough openings for size and alignment prior to installation of flashings, pans, and weather barriers.

  • Review weather barrier installation at opening is per details and mock-ups.

  • Review sill pan installation in proper sequence, with proper sealants in proper locations.

  • Review proper sealants are used and placed in correct locations.

  • Review proper fasteners are used and placed per manufactures installation instructions.

  • Review for plumb and level, and alignment with adjacent windows or features.

  • Review that shim material and placement are per manufacturers installation instructions.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.