Title Page
-
First Work Inspection - Windows
-
The Clayton
-
Conducted on
-
Prepared by
-
Select date
General Information
-
Project
-
Building
-
Level
-
Area
Field Checklist
-
Verify pre-installation meeting is conducted and all necessary parties attended.
-
Verify all materials are per submitted and approved by the AOR.
-
Verify mock ups are completed, reviewed, and corrections and modifications are complete.
-
Review rough openings for size and alignment prior to installation of flashings, pans, and weather barriers.
-
Review weather barrier installation at opening is per details and mock-ups.
-
Review sill pan installation in proper sequence, with proper sealants in proper locations.
-
Review proper sealants are used and placed in correct locations.
-
Review proper fasteners are used and placed per manufactures installation instructions.
-
Review for plumb and level, and alignment with adjacent windows or features.
-
Review that shim material and placement are per manufacturers installation instructions.