Project Information

  • Document No.

  • Part No.

  • Revision No.

  • Client Name

  • Project Name

  • Inspection Started

  • Prepared by

  • Location

Test Details

  • Drawings Supplied

  • Drawing Number

  • Drawing Revision

  • Drawing Date

  • Drawing Approval RPEQ

  • Specifications Required

  • Pipelines to be Tested

  • Pipeline
  • Water Fire Hydrant Type

  • Residual Hydrant Identification Details

  • Achieved static pressure (kPa)

  • Achieved pressure at 5L/s (kPa)

  • Achieved pressure at 10L/s (kPa)

  • Achieved pressure at 15L/s (kPa)

  • Achieved pressure at 20L/s (kPa)

  • Achieved pressure at 25L/s (kPa)

  • Achieved pressure at 30L/s (kPa)

  • Achieved pressure at maximum flow (L/s, kPa)

  • Photo of Residual Hydrant

  • Outlet Hydrant Identification Details

  • Photo of Outlet Hydrant

Test Procedure

Confirm Project Information

  • Hydrants to be tested and their details

  • Testing specification requirements

Initial Work Area Inspection

  • Is test area barricaded off or sufficiently delineated?

  • Is traffic control established?

  • Has a Safe Work Method Statement been completed and all control measures followed?

  • Environmental controls installed as and if required

Inspection Steps

  • Install Local Authority registered metered standpipe into outlet spring top hydrant

  • Install blank standpipe hydrant into residual spring top hydrant

  • Connect gauge assembly to bleed point on blank standpipe

  • Release metered standpipe tap until required flow rate is achieved and record pressure results at blank standpipe

Disassemble Steps

  • Turn off at standpipes, remove gauge assembly and release standpipes from hydrant

  • Replace hydrant lids, remove barricading and return all items to test unit

Final Demobilisation

  • Notify client of result and to contact TestX office to arrange further testing or reports

  • Calibrated gauge numbers used

  • Inspector's remarks

  • I declare that the inspection procedure was followed in accordance with the nominated specifications

  • Inspection Completed

  • Report Issue Date

Report Approval - Cam Reid

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.