Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1 Receiving Bay
-
1.1 Separated meat & vegetable washing areas
-
1.2 Cleanliness of the drainage
-
1.3 Non availability of pest harboring places
1.4 Garbage bins
-
1.4.1 Availability of garbage bins
-
1.4.2 Cleanliness of the garbage bins
-
1.4.3 Whether lids are closed
-
1.5 Availability of separated trolleys for fruits and vegetables
-
1.6 Cleanliness of the ceiling
-
1.7 Cleanliness of the wall
-
1.8 Cleanliness of the floor
2 Stores
2.1 Doors
-
2.1.1 Entry restriction of the doors
-
2.1.2 Whether doors are properly closed
-
2.2 Whether all the food items including Flour and rice bags are stored 6 inch above the floor and 6 inch away from the floor
2.3 Large food storage buckets
-
2.3.1 Adequacy of labeling
-
2.3.2 SS scoop availability
-
2.3.3 Availability of polythene covers inside the bucket
-
2.3.4 Suitability of the polythene bags
-
2.3.5 Damage proof buckets
2.4 Small food storage buckets
-
2.4.1 Proper labelling (Item name, Expiry date)
-
2.4.2 Availability of polythene covers inside the bucket
2.5 Storage racks
-
2.5.1 Proper labeling of racks
-
2.5.2 FIFO maintenance(Green for new/Red for old)
-
2.5.3 FEFO maintenance
-
2.5.4 Whether relevant goods are available in the racks <br>according to labels<br>
-
2.5.5 Cleanliness under the racks
-
2.5.6 Dust availability on the racks
-
2.5.7 Whether nonfood items are stored with food items
-
2.5.8 Whether heavy items are in the bottom layer <br> and light items are in the top layer of the racks<br>
-
2.6 Packing materials - Whether primary packing materials are properly covered<br>
2.7 Potato / Onion / Coconut storage
-
2.71 Separate storage from other foods
-
2.7.2 Availability of pellets
-
2.7.3 Availability of buckets from other foods
-
2.7.4 FIFO maintenance for coconuts
-
2.8 Oil storage
3 Freezers, Fridges and Cold rooms
3.1 Temperature records
-
3.1.1 Availability of calibrated temperature indicators
-
3.1.2 Availability of temperature records
3.1.3 Proper checking of temperature of freezers and cold rooms (Should be checked three times a day)
-
3.1.3.1 Signature of the authorized person
-
3.1.3.2 Signature of the reviewed person
3.2 Egg storage
-
3.2.1 Separate storage of eggs from other foods
-
3.2.2 Proper storage of eggs ( eggs should be stored in bottom shelves)
-
3.3.3 Cleanliness of the eggs
3.3 Sea foods
-
3.3.1 Separate storage of processed meat and raw meat
-
3.3.2 Absence of blood on the freezer floor
4 Vegetables Cool room / office
-
4.1 Bulbs should be properly covered
-
4.2 All the processed food items should be adequately covered and date tagged.
-
4.3 Glasses exposed to food preparation areas should be shatter proof.
-
4.4 Damaged strip curtain should be repaired.
5 Diary
-
5.1 Dairy
6 Rice washing/ Coconut preparation area
-
6.1 Dryness of the floor
6.2 Cleanliness
-
6.2.1 Cleanliness of the floor
-
6.2.2 Cleanliness of the door
-
6.2.3 Cleanliness of the wall
-
6.2.4 Cleanliness of the gully hole
-
6.2.5 Dust accumulation
-
6.3 Availability exhaust fan
6.4 Coconut scrapers
-
6.4.1 Proper cleaning after use
-
6.4.2 Availability of the cover
-
6.4.3 Cleanliness of the cover
7 Vegetables preparation
-
7.1 Availability of proper color coded chopping boards and knives
-
7.2 Adequacy of lightening of leaf preparation area
-
7.3 Cleanliness of the chopping boards
-
7.4 Garbage bins whether properly closed
7.5 Cleanliness
-
7.5.1 Cleanliness of the gully hole
-
7.5.2 Cleanliness of the wall
-
7.5.3 Cleanliness of the sink
-
7.5.4 Cleanliness of the floor
8 Butchery
-
8.1 Usage of the properly colour coded chopping boards & knives
-
8.2 Suitability of chopping boards
8.3 Cleanliness
-
8.3.1 Cleanliness of the floor
-
8.3.2 Cleanliness of the ceiling
-
8.3.3 Cleanliness of the sinks
-
8.4 Cleanliness of the gully holes
9 Condiment trolley
-
9.1 Separate ss containers
-
9.2 Separate spoons
-
9.3 Separate lids
-
9.4 Cleanliness of the containers
10 Brat fan
-
10.1 Availability
-
10.2 Cleanliness
11 Hot Range
-
11.1 Cleanliness of the canopy
11.2 Condition of the bulbs
-
11.2.1 Heat resistance bulbs
-
11.2.2 Whether burnt bulbs are removed
-
11.2.3 Whether bulbs are well covered
-
11.2.4 Cleanliness of the bulbs
11.3 Cookers/Burners
-
11.3.1 Regular service of cookers/ burners
-
11.3.2 Cleanliness of the cookers/ burners
11.4 Grills
-
11.4.1 Regular service of grills
-
11.4.2 Cleanliness of the grills
11.5 Ovens
-
11.5.1 Regular service of ovens
-
11.5.2 Cleanliness of the ovens
11.6 Rice steamers
-
11.6.1 Rice steamers
12 Pot washing area
-
12.1 Dryness of the floor (Not in the operation time)
12.2 Pot washing sinks
-
12.2.1 Cleanliness under the sinks
-
12.2.2 Cleanliness of the gully hole
-
12.3 Adequacy of the pot holding racks
-
12.4 Cleanliness of the pot holding racks
-
12.5 Availability of hot and cold water
12.6 Garbage bins
-
12.6.1 Availability of colour coded paddle operated garbage bins
-
12.6.2 Whether more than 3/4 of garbage bins are filled or not
-
12.7 Cleanliness of the wall
-
12.8 Cleanliness of the floor
-
12.9 Cleanliness of the ceiling
13 Waste chamber/ Garbage sorting area
-
13.1 Availability of proper place for garbage bags
-
13.2 Food residues (or sections) should not be come out of the bags
-
13.3 Proper closure of the door to prevent bad smell coming out
14 Condition of the cleaning equipment
-
14.1 Suitability for the usage
-
14.2 Absence of wooden handles
-
14.3 Availability of suitable place outside the kitchen after cleaning
15 Service counter
-
15.1 Cleanliness of the display cupboards
15.2 Appearance of the service counter employees
-
15.2.1 Clean and proper uniforms (Hair nets and masks should be worn by the employees)
-
15.3 Restricted entrance to the service counter
-
15.4 Availability of hot holding and cold holding facilities
-
15.5 Absence of damaged plates
-
15.6 Availability of colour coded, paddle operated garbage bins
16 Other Observed Critical (not listed above)
17 Additional Observations
18 Supplementary Recommendations
Acknowledgement
-
By signing below, you acknowledge that the above findings have been discussed with you and corrective actions are being taken to immediately resolve any findings. You are also acknowledging that critical violations are a violation of company policy and that you may be subject to disciplinary action up to and including termination for any negative findings contained in this report.
- Agree
- Disagree
-
Select date
Signature
-
Auditor Signature
-
Unit Manager Signature