Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
Site Inspection Report
-
Type of Inspection
- Piers
- Footing
- Slab
- Tilt Panels
- Reinforced masonry wall
- Other concrete element ( see General Notes section below)
-
DA No.
-
CC No.
-
Street Address
-
Suburb
- Alstonvale
- Alstonville
- Bagotville
- Ballina
- Ballina, East
- Ballina, South
- Ballina, West
- Booyong
- Boulder Beach
- Broadwater
- Broken Head
- Brooklet
- Cabbage Tree Island
- Coolgardie
- Cumbalum
- Dalwood
- East Wardell
- Empire Vale
- Fernleigh
- Goat Island
- Houghlahans Creek
- Keith Hall
- Knockrow
- Lake Ainsworth
- Lennox Head
- Lynwood
- Marom Creek
- McLeans Ridges
- Meerschaum Vale
- Newrybar
- North Creek
- Patchs Beach
- Pearces Creek
- Perrys Hill
- Pimlico
- Pimlico Island
- Prospect
- Rous
- Rous Mill
- Shaws Bay
- Skennars Head
- Teven
- Teven North
- Teven Upper
- Tintenbar
- Tuckombil
- Uralba
- Wardell
- Wollongbar
-
Date of inspection
-
PRE-COMMENCEMENT
- Construction Certificate issued
- HOW Cert. / OB Permit provided
- Pre-commencement Conditions satisfied
- See General Notes section below
- Provide HOW Certificate
- Provide copy of Owner Builder Permit
- Contributions / Bonds to be paid
-
SITE CONTROLS
- Satisfactory
- See General Notes section below
- Provide stabilised access
- Provide erosion & sediment controls
- Provide site WC
- Provide rubbish bin
- Provide Builder & PCA Signage
- Provide sediment & erosion sign
- Clean roadway
- Remove materials from public land
- Provide pedestrian saftey barriers
-
SITE PREPARATION
- Location generally as per plans
- See General Notes section below
- Improve site drainage to prevent water ponding
- Retain or stabilise embankments
- Provide certification for adequacy of foundation material
-
PIERS
- Generally as per engineering details
- Pier depths to natural / as per details
- See General Notes section below
- Clean out base of piers prior to pour
- Increase pier depth as directed
- Install reinforcement as per details
-
FOOTINGS
- Generally as per engineering details
- See General Notes section below
- Clean soil from treches
- Maintain cover to steel during pour
- Increase lap to reo as directed
- Increase footing depth/width as directed
- Install starter bars for masonry walls
-
SLABS
- Generally as per engineering details
- See General Notes section below
- Install bar chairs prior to pour
- Complete installation of termite mamagement system
- Increase lap to mesh as directed
- Repair damaged vapour barrier
- Provide additional bars as directed
- Provide edge rebate to slab
-
GENERAL NOTES
-
INSPECTION RESULT
- Compete works as directed and proceed
- Complete works as directed and book for re-inspection
- Work satisfactory. OK to proceed.
- Work satisfactory subject to provision of supporting documents as directed.
- Work unsatisfactory. Rectification required prior to re-inspection.
- OK to issue Interim Occupation Certificate
- OK to issue Final Occupation Certificate
-
David Tyler BPB 1804 Ballina Shire Council Ph. 02 6686 1415