Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
Site Inspection Report
-
Type of Inspection
- Footing / Slab
- Piers
- Frame
- Waterproofing
- Final
- Stormwater
- Internal drainage
- Exteranl drainage
- Building Certificate
- Swimming Pool Compliance Certificate
- Complaint investigation
- Other
-
DA / CC Information (if applicable)
-
Street Address
-
Suburb
- Alstonville
- Ballina
- Ballina, North
- Ballina, South
- Ballina, East
- Ballina, West
- Lennox Head
- Skennars Head
- Wardell
- Wollongbar
-
Date of inspection
-
SITE CONTROLS
- Satifactory
- Provide stabilised access
- Provide erosion & sediment controls
- Provide site WC
- Provide rubbish bin
- Provide Builder & PCA Signage
- Provide sediment & erosion sign
- Clean roadway
- Remove materials from public land
- Provide pedestrian saftey barriers
-
PRE-COMMENCEMENT
- Construction Certificate issued
- HOW Cert. / OB Permit provided
- Conditions satisfied
- Provide HOW Certificate
- Provide copy of Owner Builder Permit
- Contributions / Bonds to be paid
- Pre-commencement conditions to be satisfied
SITE PREPARATION & SERVICES
-
Excavations adjacent to adjoining buildings
-
Surface water drainage
-
Sub-soil drainage
-
Stormwater drainage
-
Sewer drainage / OSSM
-
Potable water supply & Plumbing
FOOTINGS AND SLABS
-
Excavations and filling
-
Site classification
-
Termite management
-
Installation of services
-
Vapour barrier
-
Edge rebates
-
Concrete and reinforcement
-
Minimum edge beam dimensions
-
Shrinkage control
-
Stump footings
MASONRY
-
Unreinforced masonry
-
Reinforced masonry
-
Weatherproofing of masonry
-
Masonry accessories
FRAMING
-
Sub-floor ventilation
-
Floor framing
-
Termite protection
-
Timber / Steel members & spans
-
Installation of services
-
Structural steel members
-
Corrosion protection
-
Plumbing and other services
ROOF & WALL CLADDING
-
Roof tiles, fixings and flashings
-
Sheet roofing corrosion protection
-
Sheet roofing fixings and flashings
-
Gutter size and fall
-
Downpipe sizes and spacings
-
Cladding fixings & stud spacings
-
Cladding flashings to openings
GLAZING
-
Windows & framed Sliding Doors to AS 2047
-
Doors and side panels Grade A Safety Glass
-
Visibility of glazing
-
Other external and internal glazing to AS 1288
-
Bathroom glazing
-
Glazing less than 500mm above floor level
FIRE SAFETY
Fire separation
-
900mm to allotment boundary
-
1800mm to another building
-
Class 10a buildings OK
-
Carport exemption
-
Allowable encroachments
-
Separating walls
-
Fire hazard properties of sarking and flexible ductwork
-
Location of combustible roof lights
Smoke alarms
-
To AS 3786 & connected to consumer mains
-
1a location - between bedrooms & remainder, any other storey with bedrooms<br>
-
1b location - in every bedroom, every corridor & between remainder, in every storey
-
1b Lighting to assist evacuation
Heating appliances
-
Open fire construction - heart, rear & side walls
-
Chimney construction
-
Insert fireplaces & flues to AS 2918
-
Free standing fireplaces to AS 2918 and clearances
Bushfire areas
-
Site assessment
-
Vehicular access
-
Water supply
-
Asset Protection Zones
Construction to AS 3959
-
Bushfire resistant timbers
-
Cladding materials
-
Doors, door frames and window frames
-
Glazing
-
Screening to windows and external gaps
-
Garage door protection
-
Water, electricity & gas services
HEALTH & AMENITY
-
Wet areas to AS 3740 & external areas to AS 4654
-
Full floor treatment to un-enclosed showers
-
Room Heights 2.4 habitable, 2.1 other, 2.0 stairs
Facilities
-
Kitchen, bathroom, laundry and WC required
-
Sanitary compartment doors
-
Joinery & other fixtures
Light
-
Natural light to habitable rooms by windows with 10% of floor area
-
Natural light to habitable rooms by roof lights with 3% of floor area
-
Artificial light OK to non-habitable wc, bath, laundry
Ventilation
-
Ventilation to habitable rooms, wc, bath, laundry by windows with 5% of floor area
-
Ventilation to wc, bath, laundry by mechanical ventilation to exterior or ventilated roof
-
Location of sanitary compartments
Sound insulation
-
Rw + Ctr of 50 to all areas (40 to ducts)
-
Discontinuous construction between bathroom, wc, laundry, kitchen & habitable rooms (other than kit) in adjoining Class 1 building
-
Construction details and services<br>
SAFE MOVEMENT & ACCESS
-
Vehicular access and parking
-
Stair Risers (115 - 190) & Treads (240 - 355) 2R + G = 550 - 700
-
Openings between risers less than 125mm
-
Landing location and length
-
Balustrade height and openings less than 125mm or as per table for wire handrails
-
Handrail location and height
-
Windows to bedrooms with FL more than 2m above surface below and sill less than 1.7m above FL
-
Windows to other rooms with FL more than 4m above surface below
SWIMMING POOLS
Internal Fences & Barriers
-
Barrier location satisfactory
-
Barrier sufficiently rigid and durable
-
Barrier 1200mm high measured on the outside and non-climbable
-
No gaps of 100mm or more through, under or around the barrier
-
900mm NCZ's present on the outside of the barrier
-
300mm NCZ on the inside of open style barriers
Boundary Fences & Barriers
-
Boundary barriers 1800mm high measured on the inside
-
900mm NCZ on the inside top of the barrier
-
1800mm high boundary fences extend past internal fences by at least 900mm
-
Adjoining fences less than 50mm wide or outside the NCZ
Gates
-
All gates swing outward from the pool area
-
All gates self close and self latch from any position
-
All gate releases at least 1500mm above the surface below
-
Where not 1500 high, gate releases shielded by a 150mm wide barrier
Windows, Doors & Balconies
-
No doors opening into the pool area
-
Window openings greater than 10mm protected by security screens
-
Balconies more than 900mm clear of the pool area
Signage & Water Re-circulation Systems
-
Resuscitation chart displayed in a prominent location
-
Swimming pool water recirculation system certified to AS 1926.3
ENERGY EFFICIENCY
-
BASIX Certificate
-
Alternative water supply and landscaping
-
Building fabric & insulation
-
Glazing
-
Ventilation
-
Lighting, power & hot water
-
Heating & cooling
ADDITIONAL CONSTRUCTION REQUIREMENTS
-
High Wind Areas (more than N3)
-
Flood Hazard Areas
STRUCTURAL DESIGN MANUALS
-
Design to AS 1170
OTHER MATTERS
-
DEVELOPMENT IS PERMISSIBLE?
-
PLANNING AND DCP CONTROLS SATISFIED?
-
DA CONDITIONS TO BE SATISFIED
-
CERTIFICATES TO BE PROVIDED
- AHD Floor Level certificate
- AHD Fill Level certificate
- Termite Management certificate
- Set-out certificate
- Certification for foundation material
- Amended engineering details for variation to works
- Certification of Bushfire Resistant Timber species
- Enngineering certification for structural beams / columns
- Amended bracing / tie-down details
- Waterproofing certificate
- Glazing of windows & doors
- Glazing of shower screens, mirrors & robe doors
- Smoke alrm installation certificate
- Certification of all BASIX commitments
- Roof truss certificate
- Insulation certificate
- Plumbing & drainage certificate
- Manufacture & installation of water re-circulation system
- Interim Fire Safety Certificate
- Final Fire Safety Certificate
INSPECTION RESULT
-
GENERAL COMMENTS
-
INSPECTION RESULT
- Satisfactory
- OK to proceed
- Compete works as directed
- Re-inspection require before proceeding
- Unsatisfactory
- Provide compliance certificate as above
- Council to send letter detailing matters to be addressed
- OK to issue Interim Occupation Certificate
- OK to issue Final Occupation Certificate
-
David Tyler BPB 1804 Ballina Shire Council Ph. 02 6686 1415
ADMINISTRATION
-
Administration tasks to be carried out
- Prepare Interim Occupation Certificate
- Prepare Final Occupation Certificate
- Prepare Quality Report
- Add to Essential Services Register
- Add to Swimming Pool Register
- Refund K&G bond
- Refund Re-location Bond
- Refund Bond (other)
- Prepare Building Certificate
- Prepare Pool Compliance Certificate
- Prepare Order
-
Quality Score
ATTACHMENTS
-
Photos
-
Site sketches