Primary Underground Installation Quality Control Review Sheet (Form 3814)
*Reviews are to be completed on all primary projects (service only projects are excluded) -
Document No.
-
Conducted on
-
Prepared by
Project Description
-
Project Description:
-
SAP Order Number:
-
Date of Review:
-
Crew Foreman:
-
Company:
Design
-
Installed per Design?
-
Field modifications approved by design engineer?
Work Site
-
Installation within ROW boundaries?
-
Scrap and salvage addressed?
-
Restoration (landscaping, grade, r/w, etc.) acceptable?
Primary Cable Installation (complete when verifiable in the field)
-
Size, type and voltage as per design?
-
Cable properly grounded in field equipment?
-
Cable grounding per Standard 30-C-3?
-
Cables tagged and phasing identified?
-
Riser pole fuse size tagged?
-
Proper separation from natural gas lines?
-
Conduit size and type as per design?
-
Trench properly backfilled and tamped?
-
Burial depth and separation per standards?
Secondary Cable Installation (complete when verifiable in the field)
-
Conductor size and type as per design?
-
Conduit size and type as per design?
-
Trench properly backfilled and tamped?
-
Proper separation from natural gas lines?
-
Burial depth and separation per standards?
Field Equipment
-
Correct Transformer KVA per design?
-
Correct equipment location as per design?
-
Work space and access as per standards?
-
Equipment grounded as per standards?
-
Lightning arrestors as per standards?
-
VFI transformers installed as per design?
-
Joint use equipment bonding per standard 30-J-3?
-
Interior Danger Sign - Primary Equipment?
-
Exterior Notice & Warning Sign - All Equipment?
-
Foundation and pad as per standards?
-
Equipment installed level and straight?
-
Fault Indicators installed as per design?
-
Secondary boots installed?
Special Crossings
-
If applicable, verify all standards and/or requirements are met (road/rail/transmission):
-
Reviewed By