Information

  • Document number

  • Facade Type

  • Level

  • Elevation

  • Conducted on

  • Prepared by(Lider)

CONTROL/CHECK

  • Obtain and check site datums, grids and setting out points

  • Have the frame elements been checked for scratches, dents?

  • Are frame elements installed within specified tolerances?

  • Are the correct fixings used as per provided drawings?

  • Are the gaps between frame elements within the specified tolerances?

  • Has the area been cleaned and waste including COSHH materials removed to allocated bins?

Comments

  • undefined

Inspected by

  • Lider

  • Witnessed by

  • Mace

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.