Information

  • Site

  • Postcode:

  • Job Number Reference:

  • Test Rod and Rope by:

  • Date:

Test Rod and Rope

Site Information

  • Photo of Lead-in Chamber (closed)

  • Photo of Lead-in Chamber (open)

  • Photo of MDU Lead-in

  • Lead-in Infrastructure blocked?

  • Have 25mm rods been used?

  • If 25mm rods have not been used BT Openreach will reject and possible fines incurred

  • Photo of 25mm rod in use in Lead-in chamber

  • Photo of 25mm rod in use in MDU Lead-in

  • Distance of the blockage from lead-in chamber (metres)

  • Photo of Blockage Location

  • Photo of Installed Rope / BFT

  • Photo of Installed Rope / BFT in Lead-in chamber

  • Photo of Installed Rope / BFT in MDU Lead-in

Sign Off

Sign Off

  • Additional Notes / Information

  • Name

  • Completed Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.