Title Page
-
Project Name 项目名称
-
Inspection Time 检查时间
-
Unit Number 单元编号
报验板块的检查项,应包括以下内容,有些内容还应拍照留有影像!
-
1.Is the unit panel assembled? If so, two photos must be taken for this item (label photo + overall unit panel photo 单元板块是否完成组装?如果完成,此项需拍2张照片(标签照片+单元板块整体照片)
-
2.Are the partition dimensions of the unit board correct? 单元板的分格尺寸是否正确?
-
3.Is the direction of the hanging code on the unit board correct, and is the type correct ?单元板的挂码方向是否正确,类型是否正确?
-
4.s the gasket around the perimeter of the unit board complete, properly notched as required, and secure? 单元板的外围四周的胶条是否完整、按要求开缺、牢固?
-
5.Are there any obvious scratches on the glass, oxidation on the film surface, or dirt on the backboard?<br>玻璃有无明显划伤、膜面氧化、背板内脏等缺陷?
-
6.Is the surface adhesive smooth, straight, aesthetically pleasing, with even width, and no residual glue on the panel?<br><br>面胶是否顺滑平直美观、胶宽均匀、面板无残胶?
-
7.Is the drainage hole clear and unobstructed? 排水孔是否通畅?
-
8.Are the reinforcing pads and transition pieces for the horizontal and vertical fins, as well as other accessories, all securely installed?横竖飞翼的加强垫块及转接件等附件是否都安装牢固?
-
9.Does the glass transparency joint meet the ITP requirements? 玻璃透光缝是否符合ITP要求
-
10.Is the quality of the suspended window inspection qualified? What about the opening force? Is the sealing of the rubber strip adequate?悬窗检查相关质量是否合格?开启力度?胶条密封等?
-
11.Is the adhesion of the finished protection corrugated board firm and correctly positioned?<br><br>成品保护瓦楞板粘贴是否牢固、位置正确?
-
12.Have the residual adhesive from the seams at the four corners of the room been thoroughly cleaned? Is the overall cleaning adequate? Photos of each corner need to be taken.室内四个角拼缝残胶是否清理干净?整体清洁是否到位?需拍每个角的照片
-
13.Is the adhesion of the static film complete and even? 静电膜粘贴是否完整、平整?
最终验收结果
-
Is the final acceptance qualified? 最终验收是否合格?
-
QC Signature QC签字