Information
-
Part No.
-
Part Name
-
Engineering Level
-
GD&T drawing no.
-
Program
-
Conducted on
-
Prepared by
-
Gage Builder Company Name
-
Contact person
-
Contact phone#
-
Location
-
Personnel
-
Take an overall view picture of the fixture or insert fixture drawing
-
Is gage made to the latest print and math data level?
-
Does gage follow latest design of GD&T, gage design?
-
Are hole, slot and distance taken from math data and tolerances taken from GD&T sheet?
-
Does any part of gage extend beyond gage base; this includes clamps and swing arms,<br>opened or closed?
-
Does each net pad have it's own clamp?
-
Do clamps with swivels have approved swivels?
-
Do tooling balls have covers?
-
Do all swing templates have lock in up & down positions and do not extend beyond base in<br>open position?
-
Do all datums match contour of the part?
-
Is the lowest checking surface of gage min 2" above base?
-
Are trim edges cut flush to nominal or grooved with green paint per approved design?
-
Are all pins and feelers stamped with CMC part # and actual mm size?
-
Are location and diameter pins inserted into base or collets properly?
-
Are datums pins extended the proper distance?
-
Do springs return datum locators properly without distorting part?
-
Do all locating, stab and contained pins move freely?
-
Are all marked surfaces clearly visible when part is on gage?
-
Are feeler zones clearly marked and stamped with feeler ID?
-
Is gage surface smooth with no tool marks?
-
Are bodylines scribed and labeled?
-
Does tolerance on location pins, feelers & go/no go pins agree with part and gage design print?
-
Do clamps w/wo swivels contact perpendicular part?
-
Are clamps made of proper clamping material with easily replacable
-
Is gage tag filled out properly with all information (CMC part #, Name, Asm #)?
-
Do certification stickers have CMC part #?
-
Will gage accept parts with nuts, studs, final assembly, etc.?
-
Are there permanently mounted gage instructions (laminated and mounted directly to the base) on the fixture?
-
Is gage third party certified?
-
Are certifications and final electronic gage prints included with gage?
-
Have all required parties signed approval been recorded?