Title Page
-
Document No.
-
Proposed Hole ID
-
Actual Hole ID
-
Bowdens Silver
-
Conducted on
-
Prepared by
Procedure
-
Sediment control installed in predefined areas prior to construction beginning (or as soon as it was safe to do so after construction was completed)?
-
Notify field supervisor so sediment controls can be installed asap
-
Tree clearing and placement in pre-defined areas
-
Separate subsoil and topsoil stockpiles in predefined areas
-
Excavated sumps (no sumps to be constructed in EEC)
-
Pad/track constructed as per Gate1 sketch
-
Please note any changes to the pre-defined pad layout from Gate 1
-
Site photo