Title Page

  • Document No.

  • Proposed Hole ID

  • Actual Hole ID

  • Bowdens Silver

  • Conducted on

  • Prepared by

Procedure

  • Sediment control installed in predefined areas prior to construction beginning (or as soon as it was safe to do so after construction was completed)?

  • Notify field supervisor so sediment controls can be installed asap

  • Tree clearing and placement in pre-defined areas

  • Separate subsoil and topsoil stockpiles in predefined areas

  • Excavated sumps (no sumps to be constructed in EEC)

  • Pad/track constructed as per Gate1 sketch

  • Please note any changes to the pre-defined pad layout from Gate 1

  • Site photo

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.