Title Page
-
Auditors (Name)
-
Date
-
Location
-
Check Area Workplace Inspection has been completed to acceptable standard (inspections each shift are a legal requirement)?
Section A - Light Vehicles
-
A1 Vehicles comply with RTIO HSEQ Standards and have current rego sticker if required?
-
A2 Daily pre-start inspections conducted on all pit vehicles?
-
A3 Observed vehicles complying with site traffic rules?
-
A4 Vehicle in acceptable 5S standard with lights and numbers clearly visible?
-
Actions / Comments:
Section B – Park-ups & Go-lines
-
B1 HME parked in Fundamentally stable position (tyres in V drain or wheel chocked)? Spoon drains adequate?
-
B2 Safe pedestrian access to parked HME?
-
B3 Light vehicles segregated from HME in park-up areas?
-
B4 Lighting present and adequate (nightshift only)?
-
Actions / Comments:
Section C – Haul Roads & Intersections
-
C1 Haul road width appropriate for designated vehicles?
-
C2 Delineators used on haul roads (clean, visible and adequately spaced)?
-
C3 Roads correctly sign-posted and signs easily readable?
-
C4 Effective dust control in place (no over-watering visible)?
-
C5 Road surface free of traffic hazards (potholes, spillage)?
-
C6 Bunds and windrows built to correct height?
-
C7 Intersections clear of spillage?
-
C8 Visibility at intersections not obstructed?
-
C9 Intersections correctly sign-posted, delineated and outside windrows in place to aide traffic management?
-
C10 Intersection designs comply with RTIO HSEQ Standards?
-
Actions / Comments:
Section D – Drill Patterns
-
D1 Drill CLUPS built and graded to standard with appropriate windrows, delineation and AHS barriers where required?
-
D2 Access only via designated and delineated access points?
-
D3 Light vehicles parked in a designated safe and fundamentally stable location?
-
Actions / Comments:
Section E – Active Mining Areas
-
E1 Light vehicles parked safely and isolated in active mining areas?
-
E2 Effective dust control in place?
-
E3 Are work areas safe from potential hazards above (other mining activities, rock falls, hang up)?
-
E4 Mining activities not posing any risks to areas below?
-
E5 Work area clear of spillage?
-
E6 Lighting plants located in suitable locations coned off with obstacles in AHS ?
-
E7 Lighting adequate in active mining areas (nightshift)?
-
E8 AHS trucks are entering load locations in a clear and visible way (not cutting corners, blind spots, obstacles /cables used etc.)?
-
Actions / Comments:
Section F – Dumps
-
F1 Windrows built to a correct height?
-
F2 Windrows constructed of competent material?
-
F3 Windrows not being used as a stopping block?
-
F4 No visible cracking along dump face?
-
F5 Dump height not exceeding 30m and not tipping into water?
-
F6 Trucks approaching tip head in clockwise direction?
-
F7 Dump markers (tyres for manned or obstacles in AHS) visible on active dumps?
-
F8 Positive gradient leading up to dump face?
-
F9 Lighting plants located in suitable locations coned off with obstacles in AHS and adequate lighting for nightshift?
-
F10 Dump on design R.L. with minimal undulations and smooth running surface?
-
F11 Access to the toe of all live tip heads windrowed off?
-
Actions / Comments:
Section G – ROM’s / Stockpiles
-
G1 Bunds and windrows built to correct height?
-
G2 Accesses onto stockpiles being reclaimed are blocked by a physical barrier?
-
G3 Lighting plants located in suitable locations coned off with obstacles in AHS and adequate lighting for nightshift ?
-
G4 Stockpile on design R.L.?
-
Actions / Comments:
Section H – Explosive facility, Magazines and Blast Patterns
-
H1 Neat and tidy, no cardboard or shrubs near buildings?
-
H2 Restricted areas sign-posted and coned off to restrict access?
-
H3 Compliant to Security regulations?
-
H4 Is the stocktake accurate, checked and signed off in book?
-
H5 Correct demarcation signage and cones used? Blast cones and signage spaced according to standard?
-
H6 MMU inspections and condition?
-
H7 Compliant with Security regulations?
-
Actions / Comments:
Section I – Safety Interaction and SWP check
-
I1 Safety interaction or CRM completed during inspection?
-
I2 SWP printed off and discussed in field with an operator conducting that task, Is it known and followed?
-
Actions / Comments:
Section J – General
-
J1 Clear and positive communication being used over radio?
-
J2 All AHS pits and areas sign-posted and hard barricaded off to restrict non-AHS personnel access?
-
J3 Areas not being used are bunded off as appropriate?
-
J4 No visible signs of potential pit wall movement / failure?
-
J5 All AHS gates and barricades situated on flat ground to allow for fundamentally stable parking?
-
J6 If there has been a manned to AHS pit change, has the relevant procedure been followed and signed off?
-
Actions / Comments:
Inspection Team
-
Quarry Manager Name
-
Quarry Manager Signature
-
Team Member 1 Name
-
Team Member 1 Signature
-
Team Member 2 Name
-
Team Member 2 Signature
-
Team Member 3 Name
-
Team Member 3 Signature
-
Actions / Comments
Inspection Report Review and Acknowledgement
-
Mine 2
-
Mine 3
-
Development 2
-
Development 3
-
Auxiliary Supervisor
-
Comments