Title Page

Site: Marandoo

  • Drill & Blast inspection

  • Date and time of inspection

  • Shift

  • Team

  • Inspection completed by

D&B Park-ups

  • L/V’s parked in Fundamentally stable position (tyres in V drain or wheel chocked)? Spoon drains adequate?

  • Delineation signage clean and in place

  • Safe pedestrian access to parked LV’s?

  • Lighting present and adequate if required (nightshift only)?

  • Drainage compliant for wet season

  • Correct signage clean and in place

Drill & Blast Patterns

  • No Open edges on Drill and blast pattern

  • Autonomous drill rig SWA is in place and accurate

  • Autonomous drill signage clean and in place

  • Correct demarcation signage and cones used? Cones and signage spaced according to standard?

  • Light vehicles parked in a designated safe location?

  • Appropriate windrows and bunding where required?

  • MMU inspections and condition?

  • Access only via designated access points?

  • Compliant with Security regulations?

  • Sleeping shots demarcated and communicated to site

Explosive facility and Magazine

  • Neat and tidy, no cardboard or shrubs near buildings?

  • Compliant to Security regulations?

  • Restricted areas sign-posted and coned off to restrict access?

  • Are emulsion pumps and hoses in a safe condition?

  • ANFO Facility secured

  • Magazines locked

  • Facility clear of combustible’s and weeds

General

  • Clear and positive communication being used over radio?

  • No visible signs of potential pit wall movement / failure?

  • Restricted areas sign-posted and coned off to restrict access?

  • Decon Unit inspected and is functional, stocked, clean and tidy?

  • All facilities clean and tidy with rubbish bins emptied

Declaration

  • I have performed a safety inspection of the GDI Drill and Blast work areas, ensuring that the workplaces are safe for persons working there. They were found to be:

  • Action taken:

  • I have taken the appropriate actions to ensure that any hazards I identified during my inspection have been rectified and/or have been demarcated in such a way as to not present a hazard to any persons working on the mine site.

  • I am satisfied that the areas inspected are safe for persons to work in.

  • Supervisor inspecting:

  • Step-up Supervisor:

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.