ITEM
-
Are all required persons on site to safely complete the lift
-
If Required is a Lift Study held on site and all persons aware of the requirements
-
Is there an approved SWMS foin place and have all personnel signed onto the SWMS
-
Are tag lines used to control loads? consider length, non conductive fibre and thickness (16mm)
-
Has adequate crane matting been placed under all Outriggers
-
Has all lifting gear been inspected and tagged - Correct quarterly tag used
-
Have all Known Services been identified
-
Is the crane being used on site correct for task - working at its capacity to undertake the lift
-
Have exclusion zones with signage been established
-
if a Permit is Required, has it been obtained and approved
-
Is a tag line being used