Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
General/Bar/Reception
-
Screw on all beet and coke nozzles
-
Prepare fruit for the day
-
Make sure all glasses are fully stocked and on the correct shelves/racks
-
Ensure the till is on, operating and ready to use - along with the float (£150)
-
Make sure all tables, chairs and bar stools are set outside neatly ready for use.
-
Has the TV been switched on?
- Yes
- No
- N/A
-
Set up windbreakers outside & umbrella if needed
-
Fill ice bucket
-
Ensure there are clean cloths and bluer roll on the bar ready for the day.
-
Clean fridges (Glass inside, outside and the framework and handles)
-
Check toilets are clean and ready for use, do they have enough toilet rolls?
-
Is the music on?
-
Are all appropriate lights on?
-
All bins fresh with new bin liners in?
-
Check keg levels and notify other staff of what is running low
Signature
-
Signature to confirm all the above has been completed?