Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Working at Heights
-
1.1. Fall risks of 6 feet or more? (including voids, pits, and trenches)
-
1.2. Lack of edge protection?
-
1.3. Unsafe or incomplete edge protection?
2. Equipment
-
2.1. Unsafe or damaged equipment? (including missing or damaged guards)
-
2.2. Incorrect equipment for job? (e.g. grinding discs for cutting)
-
2.3. Unsafe or incompatible attachments used with equipment?
-
2.4. Unlicensed operators?
-
2.5. Lack of safe work practices?
-
2.6. Lack of training in safe operation, clean-up and maintenance?
-
2.7. Lack of LOTO procedures for cleaning, servicing and maintenance?
-
2.8. Lack of inspection regime?
3. Scaffolds
-
3.1. Unlicensed persons erecting scaffold?
-
3.2. Unsafe or incomplete scaffold?
-
3.3. Lack of inspection protocol for scaffold?
-
3.4. Incompatible scaffold components? Unlabelled or do not meet AS?
-
3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)
4. Lifting Equipment
-
4.1. Unsafe or damaged plant?
-
4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?
-
4.3. Lack of maintenance, testing and inspection?
-
4.4. Lack of SWL information displayed?
-
4.5. Lack of daily inspection protocol?
-
4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?
-
4.7. Lifting equipment unlabelled, does not meet AS, no SWL displayed?
-
4.8. Unlicensed operators?
-
4.9 SWL of lifting equipment exceeded?
5. Fall Protection and Equipment
-
5.1. Unsafe or damaged harness or equipment?
-
5.2. Incompatible hooks/equipment?
-
5.3. Unlabeled?
-
5.4. Unsafe or uncertified anchor points?
-
5.5. Lack of inspection protocol for equipment?
-
5.6. Lack of or inadequate formal training for user?
6. Ladders
-
6.1. Unsafe or damaged ladders?
-
6.2. Unsafe positioning of ladders?
-
6.3. Ladder not properly secured?
-
6.4. Ladder unsuitable for job? (e.g. metal ladder used for electrical work)
7. Hazard Assessment
-
7.1. Lack of identification hazardous tasks?
-
7.2. Lack of assessment of hazardous tasks?
-
7.3. Inadequate risk controls?
-
7.4. Lack of training in hazard assessment and risk controls?
8. Hazardous Chemical (including fuel and oil)
-
8.1. Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)
-
8.2. Incompatible chemicals stored near each other?
-
8.3. Inadequate spill containment equipment?
-
8.4. Safety Data Sheets not accessible on site?
-
8.5. Lack of emergency procedures for injury/spills/fire etc?
-
8.6. Excessive quantities stored on site or in vehicles?
-
8.7. Insufficient ventilation?
-
8.8. Insufficient, or incorrect, PPE?
-
8.9. Unsuitable storage containers?
9. Emergency Response
-
9.1. Lack of, or no emergency plans for site?
-
9.2. Emergency procedures not displayed at site?
-
9.3. Lack of training and rehearsal of emergency plans?
-
9.4. Lack of, or inadequate first aid kits aid equipment for site?
-
9.5. Insufficient access to formally trained First Aiders for all shifts?
-
9.6. Unsuitable or inadequate communication equipment?
10. Personal Protective Equipment (PPE)
-
10.1. Lack of, or inadequate PPE?
-
10.2. Lack of use of PPE?
-
10.3. Lack of training in safe use, clean-up and inspection of PPE?
11. Work Environment
-
11.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)
-
11.2. Insufficient lighting?
-
11.3 Inadequate housekeeping?
-
11.4 Lack of, or inadequate noise/ vibration control?
12. Electrical Hazards
-
12.1. Unsafe electrical cords? (damaged, out of test date or untested)
-
12.2. Lack of GFCI protection?
-
12.3. Contact with underground utilities?
-
12.4. Contact with overhead electrical lines?
-
12.5. Overloading outlets?
-
12.6. Cords placed on ground or on metal structures?
-
12.7. Electrical equipment near water?
-
12.8. Electrical equipment near flammables?
-
12.9. Electrical equipment near chemicals that could cause damage?
-
12.10. Electrical cords that may be damaged from contact with moving machinery parts?
-
12.11. Electrical cords on work surfaces?
-
12.12. Lack of Lock-out/tag-out (LOTO) procedures for electrical equipment?
13. Environmental Hazards
-
13.1. Lack of/or inadequate Environmental Management plan (EMP)?
-
13.2. Lack of/or inadequate, dust suppression system?
-
13.3. Lack of/or inadequate systems to prevent contaminants entering stormwater drains?
-
13.4 Lack of water re-use systems?
14. Administrative Procedures
-
14.1. Lack of/or inadequate Site Safety Plan or Pre-Task Plan?
-
14.2. Failure to obtain permits (Council, EPA, WHS, also Hot Works, Confined Space etc)
-
14.3. Lack of, or inadequate, induction for workers, contractors, visitors?
-
14.4. Lack or, or inadequate, supervisory arrangements?
-
14.5. Lack of/or inadequate training, licenses, skills, experience?
-
14.6. Lack of/or inadequate Safe Work Method Statements (SWSM) for high- risk work?
-
14.7. Lack of, or inadequate system to review SWMS as needed?
-
14.8. Lack of/or inadequate incident notification procedures?
-
14.9. Lack of, or inadequate, routine inspections, monitoring, audits?
-
14.10. Lack of/or inadequate consultative arrangements?
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature