Information

  • Document No.

  • Project Name

  • Auditor

  • Location
  • Weather Conditions.

  • Conducted on

  • Contractors

Administration / Program

  • Do workers have current Safety/ cGMP Orientation, contractor training verification? eg. CCO, scaffold training, Fall protection, excavation, etc.

  • Is the EAP, Rescue procedure in place, muster point posted on job site and emergency numbers posted?

  • Does the Safety Station have all of the following information; current safety information, JSA, procedure 12,construction safety sign, SDS, SPA, Daily inspection checklist?

  • Are all proper sanitary conditions met? ( eg. drinking water, wash facilities, and toilets accessible and clean?)

  • Are all personnel OSHA 10Hr trained or 30Hr for foreman / Supervisors?

Housekeeping

  • Has the trash been emptied and the dumpsters are covered?

  • Are Walking/ working surfaces clear, clean, trip hazards eliminated?

  • Have contractors completed inspection checklist?

  • Are Materials stored properly: properly segregated, stacked properly, on rack or carts and chocked?

PPE

  • Are Hard hats, safety glasses, task appropriate gloves, ANSI II vest ( as required)and safety toe footwear worn by craft and management?

  • Is there work being performed that is producing flying debris?

  • Are Face shield or goggles worn as appropriate ?

  • Does the SPA reflect the use of PPE?

  • Is the work being performed exceeding 85db ?

  • Is hearing protection required? ( signage )

  • Is Hearing protection being worn?

Fall Protection

  • Is work being preformed greater than 6ft?

  • Has the elevated work permit been reviewed and completed?

  • Is Perimeter guarding provided? ( 42in top rail and Mid rail present, toe board)

  • If appropriate is PFAS used above 6ft. with SRL ( under 18ft ) or lanyard/ SRL ( above 18ft)?

  • Is Fall protection equipment inspected prior to use? ( relief step installed)

  • Are PFAS stored properly?

Fire Safety and Emergency.

  • Are there a proper fire extinguishers available with in 75ft of work ?

  • Are the sprinkler heads & fire protection unobstructed ( sprinkler heads clear by 18'' or greater)?

  • Is there a trained fire watch on duty during Hot Work?

  • Are stairwells clear of combustible or flammable materials?

  • Is there a First Aid Kit and eye wash station on job site?

General Safety

  • All containers labeled? ( HAZCOM )

  • Are flammable and combustible materials stored properly? ( SDS at point of use )

  • Is temporary lighting provided as needed? <br>(29 CFR 1926.56(a) table D-3)

  • Is equipment guarding in place as per manufacturers instructions?

  • Are tools and equipment inspected and in good condition prior to use?

Ladders/ Stairs/ Scaffolds.

  • Are there ladders being used?

  • Are ladders in good operating conditions, inspected and stored properly?

  • Are Decals legible?

  • Are personnel Maintaining 3 points of contact?

  • Is a Elevated work permit in place?

  • Is the anchorage point able to support 5,000lbs?

  • Are Stairs provided where there is a change in elevation >19'' ( EU >0.5m), and secured?

  • Are Stairs greater than 4 risers all equipped with a hand rail?

  • Are the Scaffolds correct and secured, tagged correctly, inspected daily? ( check mudsills or locked wheels)

  • Are there Safe access / egress for scaffold. ( swing gates where required)?

  • Are Holes/penetrations protected with secured covers labeled "HOLE" or barricaded?

Welding/ Cutting / Brazing

  • Has the hot work permit been reviewed and completed

  • Is torch cutting being performed with proper PPE and area prepped?

  • Are Torches, hoses, gauges / regulators in good conditions and equipped with flash back preventers?

  • Are compressed gas cylinders secured and capped when not in use?

  • Is face shield being worn with hardhat while performing arc welding?

  • Is there a trained Fire Watch with in 25ft of hot work?

  • Is SMAW welding being performed?

  • Are welding screens used where needed and properly secured?

  • Are Cables and welding machine inspected in accordance with manufactures instruction?

  • Is there a Trained fire Watch within 25ft of welding?

  • Are face shield being worn with hardhat while welding?

  • Have all combustibles been removed 35ft or covered? ( flammables removed)

Crane Lifting / Rigging.

  • Has the lift plan and permit been completed and reviewed with all affected personnel?

  • Are there trained signal men in "line of sight" of operator or other means of communication with operator?

  • Has the qualified rigger inspected all lifting equipment prior to use?

  • Has the crane been properly barricaded?

  • Have all the areas within the swing radius been notified, with proper signage , barricaded with danger tape and evacuated?

  • Is there a road closures in place for this lift?

  • Has the road closure permit been reviewed and completed?

  • Has the road been properly sectioned off from any pedestrian and vehicle traffic?

  • Have all the above crane precautionary actions been checked off?

  • Does the crane operator have their CCO license on them?

  • Operators signature

  • Has the crane inspections been completed and documented?

  • Are tag lines being used to control the load?

Excavation/ Confined Space.

  • Has the excavation permit been reviewed and completed?

  • Are the trenches/ excavations sloped properly or shored and barricaded?

  • Is trench/ excavation greater than 4ft?

  • Is body harness being worn?

  • Are there proper egress in place, ladders no more than 25ft apart?

  • Has a weather event occurred since initial evaluation from a competent person?

  • Has the competent person re-evaluated excavation?

  • Competent person signature.

  • Has the confined space permit been reviewed and completed?

  • Has the confined space attendant properly maintained the access log?

  • Are the Confined space personnel properly trained?

Motorized Equipment. ( [PIT's lifts)

  • Is there motorized Equipment being use?

  • Has the proper inspection been performed and documented?

  • Do the operators have the proper training for the equipment being used?

  • Are seat belts used by all operators?

  • Do the motorized vehicles have proper back up alarm?

  • Are flaggers in place where needed?

  • Is the rollover protection in place and maintained?

  • Has field modification been made without manufacturers written approval?

Electrical Safety.

  • Is there a energized electrical permit in place?

  • Has the energized permit been reviewed and completed?

  • Are all electrical tools and cords free of chemicals, flammables and water?

  • Is the Proper Lockout/Tagout in place where needed?

  • Are proper cords not creating a trip hazard?

  • Are cords in good condition, no cuts or repairs w/ tape?

  • Is there a 3ft clear distance around electrical panel?

  • Are GFCI's being used and closest to the power source?

  • Are the required permits completed and posted?

Environmental

  • Are all the proper GMP/SOP procedures being followed?

  • Have all proper barricades been put in place to minimize cross contamination?

  • Are all respiratory users qualified or have signed the "voluntary use" sign off sheet on job site?

  • Are the Concrete truck washout procedure being followed?

  • Is the waste handling and disposal of hazardous waste being executed properly?

  • Is secondary containment in place where needed?

  • Is Threading Machine catch box in place?

  • Are Storm sewers protected?

  • Are there chemicals at the job site?

  • Are personnel trained in the chemicals they are handling?

  • Are the SDS provided at job site? ( point of use )

  • Is there proper ventilation in place for stored chemicals?

Corrective Actions

stakeholders

  • PM or CM

  • Auditor.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.