Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Name, address and telephone number of contractor

  • Name, address and telephone number of contractor

Area where works are being Carried out

  • Area where works are being Carried out

Start date on site of works & expected duration of works

  • Start date on site of works & expected duration of works

Scope of of works ( Start to finish )

  • Scope of of works ( Start to finish )

Sequence of works (Start to Finish).

  • Sequence of works (Start to Finish).

Supervisory arrangements for contractor including full contact details

  • Supervisory arrangements for contractor including full contact details

Details of Plant and Equipment to be used including required certification.

  • Details of Plant and Equipment to be used including required certification.

Details of Materials to be used including any associated COSHH sheets

  • Details of Materials to be used including any associated COSHH sheets

Site inductions procedure confirmation ( Attending Main Contractors )

  • Site inductions procedure confirmation ( Attending Main Contractors )

Control measures in place to protect workforce carrying out the activity including falls, collapse barriers, etc.

  • Control measures in place to protect workforce carrying out the activity including falls, collapse barriers, etc.

Any additional hygiene requirement, over and above those provided

  • Any additional hygiene requirement, over and above those provided

Defined access and egress to the working area.

  • Defined access and egress to the working area.

References to assessments of Risk / Noise / Manual Handling

  • References to assessments of Risk / Noise / Manual Handling

Method of offloading materials and plant

  • Method of offloading materials and plant

Storage and distribution of materials

  • Storage and distribution of materials

PPE Requirements (Including any additional items for specific work activities)

  • PPE Requirements (Including any additional items for specific work activities)

Specific environmental or waste information required.

  • Specific environmental or waste information required.

Method Statement wrote By

  • Method Statement wrote By

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.