Information
General Description
-
Client / Site
-
PASMA number
-
Erected by
-
Double/Single
- Double
- Single
-
Mobile/Static
- Mobile
- Static
-
Type
- Aluminium
- GRP
-
Tower Manufacturer
-
Date/time erected or last modified
-
Location of tower at inspection
-
Photo of location, if necessary
-
Completed by
-
Conducted on
-
Your location can be autofilled here (for speed, good signal required) this will not be as accurate as manually completing the address
Inspection detals
The Timing of Inspections
-
This checklist refers to one of the following timings (please tick as appropriate)
-
When the tower has been built and taken into use for the first time
-
After any substantial addition, dismantling or other alteration
-
After any event likely to have effected its strength and/or stability
-
At regular intervals NOT exceeding 7 days
-
The following must be checked
-
Do you have a copy of the manufacturers instruction manual to enable you to check the tower?
-
Does a risk assessment to the tower exist?
-
Check that the environment has no detrimental affect on the safe use of the tower
-
Are the castors or base plates in contact with the ground and bearing their share of the weight of the tower and that all four breaks are applied?
-
Are the adjustable legs only being used to level the tower and not for gaining height?
-
Is the tower level in all planes?
-
Is the tower built on firm and stable ground?
-
Are stabilisers fitted and are they the correct size for the height of the tower?
-
Check that the feet are fully in contact with the ground, and wing nuts are tight?
-
Check that the foot of the stabilisers are positioned to form a square?
-
Is the bracing pattern used, in accordance with the manufactures instructions?
-
Check that the hooks on the braces are fully engaged?
-
Check that all the handrails and mid guards are fitted in the correct positions?
-
Check that all the handrails and mid guards are fitted in the correct positions?
-
Check that the interlocking device, locking frames together are engaged?
-
Check that all platforms are in the correct position on the tower?
-
Check that the trap door opens to the outboard side of the tower?
-
Is the working platform at least 600mm wide?
-
Check that, if the tower is single width, that all platforms have trap doors?
-
If wind locks are fitted to the platform, check that they are engaged?
-
Are toe boards fitted to the working platform, or any platform with gear stowed?
-
If the tower has been tied in, check that the method is adequate and at the correct intervals in accordance with the manufactures instruction manual?
-
Are you are aware of the maximum permitted load on the platform/structure?
-
Is the Mobile Tower Scaffold to be erected at least four meters away from any overhead power lines?
-
If necessary, has the work area been cordoned off?
-
If the tower is to be left incomplete has a sign been attached that warns it’s unsafe?
Sign Off
Inspection Completed - Sign off
-
I have inspected the tower, which is identified by the reference number below
-
Tower Tag reference number
-
Name / signature of inspector
-
Photo of Tower Tag