Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Bricklayer
-
Correct brick
-
Correct joint profile
-
Correct joint colour
-
Good joint sizing / consistency
-
Damaged wrap paper required
-
Sills at correct angle
-
Perps look good
-
Bricks are blended
-
Cavity width correct
-
Bricks are laid straight
-
Cavity clean
-
Pallets / surplus stacked or removed
-
Check orders / plans for non - standard items
House Keeping
-
Bin in place
-
Site left in a safe manner
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit