Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Carpenter - Framer 2
-
Bath cradle framed correctly;checked supporting blocks
-
Point loads supported correctly
-
Check walls for bowed studs / protruding nogs
-
Doorways frames fixed to floor each side
-
Doors checked trim height / width
-
Garage door noggin correct / solid
-
Additional noggin as required (Towel Rails & Shower recesses)
-
Ridge line tied together, trusses plumb
-
Wrap lapped correctly / tight (Wrap around Garage not inside)
-
Sliding doors adjusted / locking
-
Front door operation check
-
Construction key checked
-
Windows plumb and level
-
Packing around windows
-
Floors swept
-
Garage lintel up & level
-
Bath covered properly
-
Measure kitchen & cabinet locations precisely inc. pipes
-
Check orders / plans for non - standard items
-
Site left in safe manner
-
G.J signs & danger signs up
-
Job left clean
House Keeping
-
Bin in place
-
Site left in a safe manner
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit