Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Carpenter - Framer 2

  • Bath cradle framed correctly;checked supporting blocks

  • Point loads supported correctly

  • Check walls for bowed studs / protruding nogs

  • Doorways frames fixed to floor each side

  • Doors checked trim height / width

  • Garage door noggin correct / solid

  • Additional noggin as required (Towel Rails & Shower recesses)

  • Ridge line tied together, trusses plumb

  • Wrap lapped correctly / tight (Wrap around Garage not inside)

  • Sliding doors adjusted / locking

  • Front door operation check

  • Construction key checked

  • Windows plumb and level

  • Packing around windows

  • Floors swept

  • Garage lintel up & level

  • Bath covered properly

  • Measure kitchen & cabinet locations precisely inc. pipes

  • Check orders / plans for non - standard items

  • Site left in safe manner

  • G.J signs & danger signs up

  • Job left clean

House Keeping

  • Bin in place

  • Site left in a safe manner

  • G.J sign and danger sign up

  • Job left clean, rubbish in bin.

Are any rectification works required?

  • Works required

  • Date to be completed

  • Signature of person conducting the Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.