Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Carpenter - Framer 1

  • Frames erected plumb & straight

  • Building parallel & check square

  • Kitchen square & straight

  • Check fridge cavity for width and depth are as to plans

  • Bathrooms square & straight

  • All partitions & corners nailed off straight

  • Tie down done

  • Sheet bracing in place & nailed correctly

  • Hold down bolts in correct positions / tight

  • Ridge line tied together, trusses plumb

  • Strap bracing as per plan & tensioned

  • Z nails & cyclone ties on

  • Extra eave nogging for larger eave areas

  • Top plates straight & nailed off

  • Joist hangers as shown on pre cut plan

  • Valley / Hips / Gables straight

  • Frame treatment as per spec

  • Termite treatment in place

  • Roofline is straight and flat

  • Check trusses are clear of flues or Ducts inc. Return air

House Keeping

  • Cage in place and being used by trades

  • Site left in a safe manner

  • Stockpile timber in one pile away from front access point

  • G.J sign and danger sign up

  • Job left clean, rubbish in bin.

Are any rectification works required?

  • Works required

  • Date to be completed

  • Signature of person conducting the Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.