Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Drywaller

  • Confirmed per - lined inspection is okay

  • Board is fixed clear of floor

  • Ceiling butt joins propped / blocked & wadded

  • Slimline straight & true

  • End of walls square

  • All cut outs clear of plaster

  • All cove joints tidy / straight lines

  • All plaster correctly sanded

  • Floors scraped clean

  • Checked joins with halogen light

  • Check orders / plans for non - standard items

  • Insulation in required walls

  • Soundproofing in all required walls

  • Bath hob lined with Villaboard

  • Check Bath for Damage

  • Wiring brought through

House Keeping

  • Bin in place

  • Site left in a safe manner

  • G.J sign and danger sign up

  • Job left clean, rubbish in bin.

Are any rectification works required?

  • Works required

  • Date to be completed

  • Signature of person conducting the Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.