Board is fixed clear off floor an straight
-
Ceiling butt joins propped / blocked & wadded
-
external angles straight and plumb no overburden at bottom for skirt
-
End of walls square
-
All cut outs square and flush
-
All cove joints tidy / straight lines
-
All plaster correctly sanded
-
Floors scraped clean
-
Checked joins with halogen light
-
Check orders / plans for non - standard items
-
plaster screwed off 200mm cc for all tiled areas floor to ceiling no glue .
-
Check Bath for Damage
-
Bath hob lined with Villaboard on top
-
bulkheads installed
-
Soundproofing in all required walls
-
expansion joins installed for ceilings longer that 11m . Customers been made aware of this join
-
high walls plumb and within standards 5mm over 2m straightedge
-
Wiring pulled through in wet areas
-
internal junctions straight and clear with no air holes
-
Insulation in required walls
SECOND STOREY PLASTER
-
void protection called up and removed for stair installation . Plaster to be stopped and straight after stair install
-
finish to opening ascertained to finish with flooring or stop end
-
window sashes re-installed if they were removed to bring in plaster
-
plaster under stairs complete and finished to stringer
EXTERNAL
-
correct plaster and stopping techniques for ceilings . conditions not moist to trap in moisture
-
cornice in garage with brick piers supported by neat finished board
-
ascertain if customer needs to contacted re reflective light issues in raked ceilings
House Keeping
-
Bin in place
-
plaster pick up removal called up eco waste
-
Site left in a safe manner
-
asset protection for footpath checked for damage from plaster truck
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit