Slab Managers post slab Checklist
-
Slab site clean complete .
-
slab plastic pulled up and backfill against plastic not slab ( waffle pods )
-
Slab Level within AS2870 . 30mm over complete slab
-
Slab Straight ness from level . ( check at pipes . 4mm out of straight with a 2m level ) no bumps
-
leave hurdles for reference for carpenters
-
Termite correct and perimeter flashing called up
-
all stormwater risers unbroken and correct ( photos )
-
concrete installed is as per as 3600 well vibrated and steel trowel finish not powdery or rain marks
-
insitu showers in correct locations and plumbing central
-
Plumb meter box to external wall both ways
-
island conduit pipe covered to stop water ingress prior to roofing
-
all external concrete slabs to have Fall and no ponding water , with non slip finish
-
smart pans and wastes to be installed 5mm below slab level
-
Arrange electrician for all electrical conduits if required
-
caulk metal keyway to construction join pushing down stickyback able flex to one side for expansion when required
-
plumbing pipes all straight and Plumb lagging was used
-
garage weather strip to be 25-30mm step down 120mm behind and beside brick . Fall out tray to fall out and not hold water
-
rectification to fall out tray in garage does not include self leveller
-
clean site perimeter to nominated EGL and bring all dirt forward to be accessible for removal
-
arrange for supervisor to remove spoil after slab pour, or prior to pour .
-
additional reo to be removed or cut and placed in bin
-
check install wet earth stake to power pole in slab
-
check the install of plumbing conduit for water . Not too close to meter box .
GJ GARDNER OH&S
-
sign in Hazard co app
-
keep SWMS on site at all times
-
current Public liability and White card up to date and sent to GJ Gardner office
-
HSCP in Meter box of house unless otherwise specified by the site manager
-
site to be left in a safe manner . All rubbish picked up and placed in bin or in a bag beside the bin if the bin is full
-
trades to be courteous and respectful to adjoining properties and neighbours
-
Trades not to be instructed by customers and Customers are not to be let in to site
-
arrange and manoeuvre Bins and Toilet after pour to suit site
G J GARDNER PAYMENT
-
Purchase orders to be handed in with all invoices emailed to geelong.accounts@gjgardner.com.au
-
All extras to have an attached Manual order number from the site managers and must be invoiced separately
-
Invoices as per purchase order unless otherwise discussed
TRADES ACKNOWLEDGEMENT
-
Trade acknowledgement and acceptance