Slab Managers post slab Checklist

  • Slab site clean complete .

  • slab plastic pulled up and backfill against plastic not slab ( waffle pods )

  • Slab Level within AS2870 . 30mm over complete slab

  • Slab Straight ness from level . ( check at pipes . 4mm out of straight with a 2m level ) no bumps

  • leave hurdles for reference for carpenters

  • Termite correct and perimeter flashing called up

  • all stormwater risers unbroken and correct ( photos )

  • concrete installed is as per as 3600 well vibrated and steel trowel finish not powdery or rain marks

  • insitu showers in correct locations and plumbing central

  • Plumb meter box to external wall both ways

  • island conduit pipe covered to stop water ingress prior to roofing

  • all external concrete slabs to have Fall and no ponding water , with non slip finish

  • smart pans and wastes to be installed 5mm below slab level

  • Arrange electrician for all electrical conduits if required

  • caulk metal keyway to construction join pushing down stickyback able flex to one side for expansion when required

  • plumbing pipes all straight and Plumb lagging was used

  • garage weather strip to be 25-30mm step down 120mm behind and beside brick . Fall out tray to fall out and not hold water

  • rectification to fall out tray in garage does not include self leveller

  • clean site perimeter to nominated EGL and bring all dirt forward to be accessible for removal

  • arrange for supervisor to remove spoil after slab pour, or prior to pour .

  • additional reo to be removed or cut and placed in bin

  • check install wet earth stake to power pole in slab

  • check the install of plumbing conduit for water . Not too close to meter box .

GJ GARDNER OH&S

  • sign in Hazard co app

  • keep SWMS on site at all times

  • current Public liability and White card up to date and sent to GJ Gardner office

  • HSCP in Meter box of house unless otherwise specified by the site manager

  • site to be left in a safe manner . All rubbish picked up and placed in bin or in a bag beside the bin if the bin is full

  • trades to be courteous and respectful to adjoining properties and neighbours

  • Trades not to be instructed by customers and Customers are not to be let in to site

  • arrange and manoeuvre Bins and Toilet after pour to suit site

G J GARDNER PAYMENT

  • Purchase orders to be handed in with all invoices emailed to geelong.accounts@gjgardner.com.au

  • All extras to have an attached Manual order number from the site managers and must be invoiced separately

  • Invoices as per purchase order unless otherwise discussed

TRADES ACKNOWLEDGEMENT

  • Trade acknowledgement and acceptance

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.