Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Plumber # 2

  • Solar unit commissioned

  • Shower mixers sealed to wall

  • All fixtures sealed where necessary

  • Plugs for all basins / baths etc.

  • Seal waste & fit bends

  • Gas work certified

  • Final test on all fittings completed

  • Check orders / plans for non - standard items

  • Check for chips & scratches

  • Silicone neatly around fixtures (bath, basins, tolilets)

House Keeping

  • Bin in place

  • Site left in a safe manner

  • G.J sign and danger sign up

  • Job left clean, rubbish in bin.

Are any rectification works required?

  • Works required

  • Date to be completed

  • Signature of person conducting the Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.