Information
-
Project Name
-
Project Number
-
Client
-
Conducted on
-
Prepared by
-
Accompanied by
-
Location
-
Personnel (please give details of the personnel currently on site (i.e. job role and number of persons)
-
Plant & Equipment onsite?
-
List of all subcontractors onsite
-
Project Category (Please select from the drop down menu the categories which best describe this project)
- Demolition
- Soft Strip
- Diamond Drilling
- Scaffold Erection
- Asbestos Removal
Inspection Record
-
This report is intended for use as a record of your observations whilst visting site and should be an accurate reflection of how you perceive the site conditions at the time of your visit.
-
Overview of current works
-
Have issues raised during previous visits been actioned..?
Method Statements
-
Is there a method stement in place to cover the scope of all works currently being undertaken on site?
-
Are the works being undertaken in compliance with the method statement?
-
Is there currently a requirment to make ammendments to the method statement?
-
If yes, has the GDL operations team been notified?
-
Has the Principal Contractor been notified of ammended metodology?
-
Has the Principal Contractor approved the amendment?
Site Welfare
-
Are welfare facilities suitable for the number of persons expected to use them?
-
Are welfare facilities cleaned regularly?
Exclusion Zones
-
Are drop zones double fenced with appropriate signage?
-
Are there suitable exlusion zones in place where required?
-
Is the integrity of exlusion zones sufficently maintained?
Safety Signage
-
Is there suitable safety signage in place?
Plant and Machinery
-
Are operators completing daily pre-use checks?
-
Is all plant in good working order?
-
Are amber beacons operational?
-
Are seat restraint beacons operational?
-
Is there evidence that attachments are being greased & maintained?
Traffic Routes
-
Are traffic routes suitably segregated?<br>
-
Are traffic routes suitably signed?<br>
-
Is there separate pedestrian access and egress provided?<br>
Excavations
-
Is edge protection in place with warning signage & a minimum of 2m away from any leading edge?<br>
-
Is there suitable excavation warning signage in place?<br>
-
Are excavation sides suitably supported?<br>
PPE
-
Are site PPE requirements displayed?<br>
-
Are PPE rules being complied with?<br>
Housekeeping
-
Is site kept clean and tidy?<br>
-
Are work areas free from trailing cables / hoses?<br>
-
Are work areas free from overhead obstruction? (i.e. hanging cables)<br>
Work at Height
-
Is tower scaffold equipment erected correctly?<br>
-
Is podium scaffold Equipment erected correctly?<br>
-
Do site works involve harness use?<br>
Isolations
-
Have any necessary service isolations been completed?<br>
-
Are copies of isolation certificates available?
-
Are all service positions marked on site?<br>
Temporary Works
-
Are all temporary works in good order? (i.e. hoarding)<br>
-
Are all temporary works recorded on the temporary works register?<br>
-
Are temporary works design drawings available on site?<br>
-
Have all temporary works been signed off by the TWC?<br>
-
Are regular temporary works inspections being undertaken?<br>
Environmental
-
Is there suitable spill kit provision?<br>
Waste
-
Is waste being segregated correctly?
-
Are waste bins being filled to capacity?
Site Security
-
Is the site boundary secure?
-
Is there any evidence of trespass?
-
Is there provision for secure tool and equipment storage?
-
Is there provision for secure plant storage?
-
Is there provision for secure attachment storage?
Programme
-
Is the project on programme?
-
Have there been any significant delays?
-
Please give details of delay causality below:
-
Are additional resources required?
Commercial
-
Has there been any additional works?
-
Has a written instruction been received to cover the works?
-
Are daily site records being recorded?
-
Has GDL commercial team been notified?
Positive observations
-
Positive observation
-
Inspection Sign off
-
Visiting GDL Contracts Manager to sign upon completion