Information

  • Project Name

  • Project Number

  • Client

  • Conducted on

  • Prepared by

  • Accompanied by

  • Location
  • Personnel (please give details of the personnel currently on site (i.e. job role and number of persons)

  • Plant & Equipment onsite?

  • List of all subcontractors onsite

  • Project Category (Please select from the drop down menu the categories which best describe this project)

Inspection Record

  • This report is intended for use as a record of your observations whilst visting site and should be an accurate reflection of how you perceive the site conditions at the time of your visit.

  • Overview of current works

  • Have issues raised during previous visits been actioned..?

Method Statements

  • Is there a method stement in place to cover the scope of all works currently being undertaken on site?

  • Are the works being undertaken in compliance with the method statement?

  • Is there currently a requirment to make ammendments to the method statement?

  • If yes, has the GDL operations team been notified?

  • Has the Principal Contractor been notified of ammended metodology?

  • Has the Principal Contractor approved the amendment?

Site Welfare

  • Are welfare facilities suitable for the number of persons expected to use them?

  • Are welfare facilities cleaned regularly?

Exclusion Zones

  • Are drop zones double fenced with appropriate signage?

  • Are there suitable exlusion zones in place where required?

  • Is the integrity of exlusion zones sufficently maintained?

Safety Signage

  • Is there suitable safety signage in place?

Plant and Machinery

  • Are operators completing daily pre-use checks?

  • Is all plant in good working order?

  • Are amber beacons operational?

  • Are seat restraint beacons operational?

  • Is there evidence that attachments are being greased & maintained?

Traffic Routes

  • Are traffic routes suitably segregated?<br>

  • Are traffic routes suitably signed?<br>

  • Is there separate pedestrian access and egress provided?<br>

Excavations

  • Is edge protection in place with warning signage & a minimum of 2m away from any leading edge?<br>

  • Is there suitable excavation warning signage in place?<br>

  • Are excavation sides suitably supported?<br>

PPE

  • Are site PPE requirements displayed?<br>

  • Are PPE rules being complied with?<br>

Housekeeping

  • Is site kept clean and tidy?<br>

  • Are work areas free from trailing cables / hoses?<br>

  • Are work areas free from overhead obstruction? (i.e. hanging cables)<br>

Work at Height

  • Is tower scaffold equipment erected correctly?<br>

  • Is podium scaffold Equipment erected correctly?<br>

  • Do site works involve harness use?<br>

Isolations

  • Have any necessary service isolations been completed?<br>

  • Are copies of isolation certificates available?

  • Are all service positions marked on site?<br>

Temporary Works

  • Are all temporary works in good order? (i.e. hoarding)<br>

  • Are all temporary works recorded on the temporary works register?<br>

  • Are temporary works design drawings available on site?<br>

  • Have all temporary works been signed off by the TWC?<br>

  • Are regular temporary works inspections being undertaken?<br>

Environmental

  • Is there suitable spill kit provision?<br>

Waste

  • Is waste being segregated correctly?

  • Are waste bins being filled to capacity?

Site Security

  • Is the site boundary secure?

  • Is there any evidence of trespass?

  • Is there provision for secure tool and equipment storage?

  • Is there provision for secure plant storage?

  • Is there provision for secure attachment storage?

Programme

  • Is the project on programme?

  • Have there been any significant delays?

  • Please give details of delay causality below:

  • Are additional resources required?

Commercial

  • Has there been any additional works?

  • Has a written instruction been received to cover the works?

  • Are daily site records being recorded?

  • Has GDL commercial team been notified?

Positive observations

    Positive observation

Inspection Sign off

  • Visiting GDL Contracts Manager to sign upon completion

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.