Title Page

  • Conducted on

  • Prepared by

  • Location

Project Information

  • Please enter the project name and number

  • Please enter the project address:
  • Who is the Client for this project?

  • Who is the Principal Contractor for this project?

  • Who is the site contact?

  • Please enter the site contact telephone number:

  • Please enter the site contact email address:

  • Please enter project start date

  • Please enter expected project completion date

  • Please enter the expected project duration and number of phases if applicable

  • Is a section 81 demolition notice required for this project?

  • if yes, who is responsible for submitting Section 80 application?

  • Has section 80 application been submitted to the local authority?

  • Has section 81 notice been returned by the local authority?

  • Is an F10 notification required for this project?

  • If yes, who is responsible for submitting the F10 notification?

  • Are there drawings or plans available for this project?

  • If yes, what type of drawings or plans are available?

Asbestos Removal

  • Is Asbestos removal required on this project?

  • If yes, who is responsible for undertaking the removal works?

  • If no, has Asbestos removal been undertaken by others prior to GDL works Commencing?

  • If yes, has a stage 4 air clearence certificate been issued ?

Services

  • Are overhead services present?

  • If yes, please give details:

  • Has the client arranged for service disconnections to be undertaken?

  • If no, give details of any further action required:

  • If yes, are isolation certificates available?

  • If no, give details of further action required:

  • If yes, please select which isolation certificates have been provided from the drop down menu

  • Is there a gas meter present?

  • If yes, please give details: (service provider, location, meter number etc.)

  • Please give current meter reading:

  • Is there an electricity meter present?

  • If yes, please give details: (service provider, location, meter number etc.)

  • Please give current meter reading:

  • Is there a water meter present?

  • If yes, please give details: (service provider, location, meter number etc.)

  • Please give current meter reading:

  • Is there a fire hydrant nearby?

  • If yes, please give details: (location, suitability for use as dust suppression supply, etc.)

  • Please select the option form the drop down menu that best describes the water pressure:

  • Will a hydrant licence be required?

  • If yes, who is responsible for obtaining hydrant licence?

Live Services

  • Is work in close proximity to live services required?

  • If yes, what type of services are present?

  • Who is responsible for providing protection?

  • Has the client been provided with and signed the GDL disclaimer document?

  • Will extra time on program be required?

Surveys

  • Is a survey for unknown utility services required on this project?

  • If yes, who is responsible for commissioning unknown utilities survey?

  • Has an R&D Asbestos survey been undertaken on this project?

  • If No, who is responsible for commissioning R&D Asbestos survey?

  • Is a drainage survey required on this project?

  • If yes, who is responsible for commissioning drainage survey?

  • Is an UXO survey required on this project?

  • If yes, who is responsible for commissioning UXO survey?

  • Is there potential for contaminated soil on this project?

  • If yes, who is responsible for commissioning soil sampling?

  • Are any additional surveys not listed above required on this project

  • If yes, please give details:

Temporary Works

  • Are temporary works required on this project?

  • If yes, what temporary works are required? (please select all relevant options from the dropdown menu)

  • Who is responsible for appointing the Temporary Works Coordinator (TWC) for this project?

  • Please enter name of TWC

  • PLease enter contact telephone number for TWC

  • Please enter email address for TWC

Welfare

  • Who is responsible for providing welfare on this project?

  • Where GDL are responsible what type of welfare units are required?

  • What type of sewage removal is required?

Access

  • Are there any width restrictions in relation to access? (f yes please take photographs and give details)

  • Are the any height restrictions in relation to access? (f yes please take photographs and give details)

  • Are there any weight restrictions in relation to access? (f yes please take photographs and give details)

  • What type of parking is available on this project?

Highways

  • Is a Skip Licence required? (7 days notice required prior to start date)

  • Is a scaffold licence required? (7 days notice required prior to start date)

  • Is a hoarding licence required? (7 days notice required prior to start date)

Plant

  • What plant is required for this project?

  • Wher a demolition excavator is required what capacity would be best suited to the works?

  • Is any specialist plant required for this project?

  • If yes, please give details:

Material Salvage and Recycling

  • Is there potential for material salvage on this project?

  • If yes, please select materials to be salvaged form the drop down menu:

  • Is there potential for the recycling of glass on this project?

  • If yes, please give details:

  • Is there potential for the recycling of UPVC on this project?

  • If yes, please give details:

  • Is there potential for the recycling of plasterboard on this project?

  • If yes, please give details:

  • Is there potential for the recycling of lighting tubes on this project?

  • If yes, please give details:

  • Is there potential for the recycling of tyres on this project?

  • If yes, please give details:

  • is there potential for the recycling of tarmac on this project?

  • If yes, has a test for the presence of coal tar been undertaken?

  • If yes, please give details:

  • Is there potential for the recycling of timber on this project?

  • If yes, please give details:

  • Is there the potential for the recycling of metal on this project?

  • If yes, please select metal categories from the drop down menu:

  • Is is crushing due to be undertaken on this project?

  • If yes, what grade of material is required?

  • Who is responsible for organising quality testing on the crushed material?

  • What is to happen with the end crushed material product?

  • Is there potential for the recycling or reuse of furniture on this project? (consideration should be given to donating to charity)

  • If Yes, please give details:

  • Is there to potential for fire extinguisher salvage and reuse on this project?

  • If yes, please give details:

Environmental

  • Is there a requirement for tree works to be undertaken on this project?

  • If yes, please select the type of tree works from the drop down menu

  • Who is responsible for organising the tree works?

  • Are there any Tree Preservation Orders in place?

  • If yes, please give details:

  • Is the set up of a tree protection zone required?

  • If yes, please give details:

  • Is a tree root protection zone required?

  • If yes, please give details:

  • Are drawings available of proposed tree and root protection zones?

  • Do tree roots extend beyond the site boundary?

  • Is there a requirement for green waste to be removed from site?

  • If yes, who is responsible for the removal of green waste?

Environmental Surveys

  • Has an ecological survey been undertaken for this project?

  • If no, who is responsible for commissioning ecological survey?

  • If yes have any invasive plant species been identified?

  • If yes, please select species identified from the drop down menu:

  • Is the site considered to be located within an area of specific environmental concern?

  • If yes, please select the most appropriate option form the drop down menu:

  • Has a habitat survey been undertaken for this project?

  • If no, who is responsible for commissioning habitat survey?

  • If yes, please select endangered species identified in survey from the drop down menu:

  • Are there any watercourses in close proximity to this project?

  • If yes, are protection measures required?

  • If yes, please give details below?

COSHH

  • Are there any inherited COSHH items (chemicals, oils, etc.) which require specialist disposal?

  • If yes, please give details of COSHH items identified for removal:

  • Who is responsible for orgainising the removal of the COSHH items listed above?

  • Are there any fuel tanks which require removal?

  • If yes, have they been previously emptied, degassed and a certificate of cleanliness issued?

  • If no, who is responsible for engaging a specialist subcontractor to undertake these works?

Environmental Monitoring

  • Is there a requirement for environmental monitoring to be undertaken on this project?

  • If yes, who is responsible for undertaking environmental monitoring?

  • Where GDL are responsible, please select monitoring categories from the drop down menu:

Waste Notes

  • Are waste notes compliant? (Please select a minmum of 3 waste notes and check that they have been completed correctly, ensuring that you include photographs)

  • If Non-Compliant please give details of compliance failings

  • Have the waste notes sampled been entered in the onsite waste material checklist?

  • If no please give details

Sign off

  • Once you have completed all mandatory sections the checklist in full, please sign below.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.