General

General

  • Is there a JSA/s in place?

  • Has this/these been communicated to personnel?

  • Are SHE/EXD directional signs in place from the start point to the top of ramps?

  • Is the haulroad free from running water (i.e. no water seeping through spoil)?

  • Are high walls and low walls stable?

  • Are drainage points free from obstructions and wing walls in place?

  • Are call up signs in place at every entrance with correct numbering and legible?

  • Are truck park ups and crib room areas compliant and maintained with correct drainage, V-Drain, signage & lighting in place?<br>

  • Does the dig bench appear stable?

Dig Area

Dig Area

  • Are both active mining signs in place?

  • Are area restricted signs, red lights and barricading in place for blast areas?

  • Are bund walls established outside of crest pegs (to prevent open edges)?

  • Are bund heights at 1.6m?

  • Is the light vehicle park up areas signed and in a safe location?

  • Is the area free from standing water?

  • Is the loading face height appropriate?

  • Is the access graded and free from spillage?

  • Is adequate lighting in place?

  • Is lighting plant an adequate distance from the high wall?

  • Does the high wall and low wall appear stable?

  • Does the digger bench have a small bund in place (to prevent working at heights issues, including a bund preventing access to the dig bench)?

Road Conditions

Road Conditions

  • Are road conditions on the dig bench floor adequate?

  • Are edges free of oversized rocks?

  • Are haul roads and ramps / gradient / camber adequate - max 10%?

  • Are haul roads at least 35m wide?

  • Are controls in place for narrow sections of road?

  • Is bunding in good condition and correct height?

  • Is centre bunding in place on left hand downhill corners?

  • Is catch bunding in place where roadways run below dig units?

  • Are all roads graded, no spillage, holes, etc?

  • Is adequate signage and delineation in place?

  • Are there any area where high risk bunding is required?

  • Is the high risk bunding to a standard height of 3m?

Watering Inspection

Watering Inspection

  • Observe if the water truck is working to the work instruction including:

  • Is there a 5m dry line?

  • Has a BMA Safe been conducted and controls reviewed?

  • Is single spray down ramps being adhered to?

  • Has a BMA Safe been conducted and controls reviewed?

Water Truck Inspection

  • Water Truck No:

  • Are the sprays functional?

  • Is spray width acceptable? (approx. 7m with tolerance of approx. 0.5m each way).

  • What is the spray width observed?

Dump Details

Dump 1 Details

  • Dump Location:

  • Dozer No:

  • Dozer Operator:

  • Is the APS working?

  • Is the Dump on Grade?

  • +/- metres?

  • Is light vehicle park up bay in place with signage?

  • Are both active mining area signs in place?

  • Is there another active dump?

Dump 2 Details

  • Dump Location:

  • Dozer No:

  • Dozer Operator:

  • Is the APS working?

  • Is the Dump on Grade?

  • +/- metres?

  • Is light vehicle park up bay in place with signage?

  • Are both active mining area signs in place?

  • Is there another active dump?

Dump 3 Details

  • Dump Location:

  • Dozer No:

  • Dozer Operator:

  • Is the APS working?

  • Is the Dump on Grade?

  • +/- metres?

  • Is light vehicle park up bay in place with signage?

  • Are both active mining area signs in place?

Dump 1 Inspections

Dump 1 - Inspection 1 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 1 - Inspection 2 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 1 - Inspection 3 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 2 Inspections

  • Is there a second active dump location?

Dump 2 - Inspection 1 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 2 - Inspection 2 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 2 - Inspection 3 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 3 Inspections

  • Is there a third active dump location?

Dump 3 - Inspection 1 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 3 - Inspection 2 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Dump 3 - Inspection 3 of 3

  • Time:

  • Are controls in place to prevent access below and beside advancing tip heads?

  • Is the dump square?

  • After observation - Are trucks using bunds as a guide and not as a brake?

  • Are you dumping short and pushing?

  • Is V-Drain established 10m from tip head?

  • Is dump travelling / approach surface adequate?

  • Are bund walls at required height and width. (1.6m)?

  • Are lighting plants set up for night shift?

  • Is the area free from signs of cracking or slumping?

  • Are lighting plants in place?

Sign Off

  • Comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.