Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Loading Unit
- EXD66
- EXD67
- EXD68
- EXD30
- EXD81
- EXD80
- EX82
-
Channel #
-
Light Vehicles
-
Crib Hut Location
-
Dig Plan Details
-
Primary Dump
-
Second Dump Option
-
General Comments / Handover notes
Shift Audit
- Shift Audit
-
Select Excavator to Audit
- EXD66
- EXD67
- EXD68
- EXD30
- EXD81
- EXD80
- EX82
-
Number of Trucks Planned Number of Trucks Actual
-
Shift Target BCM Volume Predicted BCM Volume
-
If less than plan what are the causes?
-
Cycle Dig Rate Required BCMs/Hr
-
If dig rate is lower than target what are the causes?
Safety
-
Were there any safety incidents on shift?
-
If yes, has the primary information been sent to the Superintendent and the event entered into EMS? <br>*NOTE* Primary information includes: SITREP report, pictures, DNA, statements, DSS footage and relevant modular data
-
Were there any hazards identified on shift?
-
If yes, has the hazard been reported to the OCE, entered in Fiori and communicated to oncoming Supervisor?
-
Is there a JSA in place for your work area?
-
If yes, attach a copy
-
Have all work areas been inspected?
-
Does the work area meet GRM SHMS Standards
-
Are people working above or below work areas?
-
If yes, what are the controls in place?
-
Is there an active Geotech hazard in your area?
-
If yes, has it been added to the OCE report and communicated to responsible work group
-
Has a Geotechnical Operations Checklist been completed for your Dynamic Area?
People
-
Has every operator had a safe start, OCE report communicated and been given work instructions?
-
Attach safe start and attendance sheet
-
Has the dig and dump plan been communicated to your team at the safe start?
-
Have all LV's prestarts been completed and submitted? Have they been washed, cleaned and refueled for your area?
-
Are there any interaction issues with other departments?
-
Have all unplanned absenteeism been accounted for and welfare checks completed for failures to notify?
-
If no, is escalation required (SITREP report)?
Delays
-
Have you checked with the Tech Specialist that all equipment delays are correct for shift?
Department Handover
-
Was handover to Mine Service Drill Prep completed?
-
If yes, is the handover attached?
-
Was handover to Mine Services completed for top of coal prep?
-
If yes, is the handover attached and signed sheet sent to OS Superintendent?
Compliance: Dig
-
Is your dig area compliant to plan? Attach MROC photo
-
Have non-compliances been reported to oncoming supervisor?
-
Is the dig area wide enough to optimise spotting?
-
Has the pit edge bunding been dug out and replaced with loose material to form a high risk bund?
-
Attach Photo of Dig Area
Compliance: Dump
-
Is your dump area compliant to plan? (E.g. Level, dump crest and toe on design) show photo of VNC viewer?
-
Have non-compliances been reported to oncoming supervisor?
-
Are the bunds on the Dump compliant?
-
Are there any bodies of water/ mud at the toe of the dump?
-
Are controls in place to stop material rolling onto an active road or work area?
-
Have you observed any cracking or slumping on the dump?
-
If yes, what controls did you put in place?
-
Attach photo of hazard
-
Attach photos of dump
Compliance: Circuit
-
Is high risk bunding and intersection bunding in place to design?
-
Have all ramps and roads been maintained and meet site standards?
-
Are lights set up for NS with adequate bunding in place?
-
Is all signage in place?
-
Are all overload bays compliant?
-
Attach any Circuit photos
Sign off report
-
Absenteeism - unplanned leave Supervisor checklist completed?
-
Attached a photo of checklist
-
Absenteeism entered into corvus and SAP
-
L2 MOP board updated and impacts resulting in red metrics have been communicated to oncoming Supervisor?
-
Provide context on delays throughout shift which may cause red metrics (delay type and times)
-
Signature